Permit Reviews
Permit Number - TC-MDP-1123-01735
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 04/18/2024 | APPROVED |
| 06/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/14/2024 | APPROVED |
| 03/01/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/08/2024 | REQUIRES RESUBMIT |
| 11/03/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/13/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1123-01735
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-1123-01735
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Date | Description | Comments |
|---|---|---|
| 11/03/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/03/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/13/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/11/2023 | Post-Tension Inspection Report is required. | |
| 08/24/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/03/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01735
Permite Description: Casas del Cerrito H35G Model Plan
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2024 | ENGR Engineering Final | N/A | Not Ready | side gate will not close. correct berm between 9744 & 9738 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01735
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 04/19/2024 | COT - RSPL - Rough Soil | Passed | ||
| 04/19/2024 | COT - RSPL - Sewer | Passed | ||
| 04/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 04/29/2024 | BULD - Electrical Clearance | Passed | TEP ECO CLEARANCE ISSUED. | |
| 04/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab. | |
| 04/29/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab. | |
| 04/29/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab. | |
| 04/29/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab. | |
| 05/14/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/14/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 05/29/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/29/2024 | RSBU - Building Progress | Passed | ||
| 05/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/17/2024 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls are properly drywalled with the correct screw pattern per plan. Okay to proceed with tape, texture, and paint of walls and ceiling. | |
| 07/22/2024 | COT - BULD - SWG Clearance | Passed | All gas valves are installed at gas appliance locations. SWG Clearance issued to Southwest Gas Company to install meter and turn on gas. | |
| 08/08/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 08/08/2024 | RSBU - Building Final | Passed | ||
| 08/08/2024 | COT - RSME - Mechanical Final | Passed | ||
| 08/09/2024 | COT - RSEL - Electrical Final | Passed | ||
| 08/09/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/21/2024 | ENGR Engineering Final | Passed |