Permit: TC-MDP-1123-01732
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9756 E GRAY HAWK DR
Address NEW:
9756 E GRAY HAWK DR
Apply Date:
11/01/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito 3542 Model Plan
Permit Reviews
Permit Number - TC-MDP-1123-01732
Permit Status: Inspections complete
Permit Description: Casas del Cerrito 3542 Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 04/18/2024 | APPROVED |
| 08/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/13/2024 | APPROVED |
| 04/18/2024 | RESTAMP - RESIDENTIAL v.1 | 04/18/2024 | APPROVED |
| 03/01/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/08/2024 | REQUIRES RESUBMIT |
| 02/06/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 02/13/2024 | APPROVED |
| 11/03/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/13/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1123-01732
Permit Status: Inspections complete
Permit Description: Casas del Cerrito 3542 Model Plan
| Date | Description | Comments |
|---|---|---|
| 11/03/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/03/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/13/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/13/2023 | Post-Tension Inspection Report is required. | |
| 08/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/24/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/03/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01732
Permit Description: Casas del Cerrito 3542 Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is complete and connected to city sewer. Backwater valve is installed between clean outs. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 05/01/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and connected to city sewer. Backwater valve is installed between clean outs. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 05/01/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and connected to city sewer. Backwater valve is installed between clean outs. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 05/01/2024 | COT - RSPL - Yard Water Line | Passed | Main water line is connected to the city water system with a meter. System is under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 05/10/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 05/10/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade | |
| 05/10/2024 | BULD - Electrical Clearance | Passed | Electrical panel is installed with 2 ground rods 6 plus feet apart. TEP ECO Clearance issued. | |
| 05/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 05/10/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 06/03/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Exterior walls are properly secured to concrete floor with shot pins, a/b bolts, and masa clips. Shear wall is properly secured per the plan. | |
| 06/03/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly nailed and secured to the top plate with nails and H2.5 clips nailed per code. | |
| 06/18/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/13/2024 | COT - BULD - SWG Clearance | Passed | ||
| 08/14/2024 | RSBU - Building Progress | Passed | ||
| 08/14/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed and functional per building plan and city guidelines. | |
| 08/26/2024 | COT - RSME - Mechanical Final | Passed | Passed--Construction is completed. Mechanical and plumbing fixtures are installed and operational. Electrical panel dead front is not properly installed breakers need adjustments to allow dead front to be tight to edges of breakers. All outdoor receptacles need to be WR rated. Landscaping needs to be replaced after sewer line repair. | |
| 08/26/2024 | COT - RSPL - Plumbing Final | Passed | Passed--Construction is completed. Mechanical and plumbing fixtures are installed and operational. Electrical panel dead front is not properly installed breakers need adjustments to allow dead front to be tight to edges of breakers. All outdoor receptacles need to be WR rated. Landscaping needs to be replaced after sewer line repair. | |
| 09/05/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy. | |
| 09/05/2024 | ENGR Engineering Final | Passed | ||
| 09/05/2024 | RSBU - Building Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy. |