Permit: TC-MDP-1123-01725
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY
Address NEW:
9125 E CATALINA HY
Apply Date:
11/06/2023
Applicant:
Description:
DUPLEX CASITA1X1 T20-M0044
Permit Reviews
Permit Number - TC-MDP-1123-01725
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/06/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/16/2023 | APPROVED |
| 03/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/07/2025 | APPROVED |
| 03/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/04/2025 | APPROVED |
| 07/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/01/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1123-01725
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
| Date | Description | Comments |
|---|---|---|
| 11/06/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/06/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/06/2023 | Masonry Inspection Report submittal review is required. | |
| 03/06/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/30/2023 | Post-Tension Inspection Report is required. | |
| 11/02/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/06/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/06/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 03/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1123-01725
Permite Description: DUPLEX CASITA1X1 T20-M0044
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2024 | RSBU - Building Progress | N/A | Not Applicable | |
| 01/31/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 1-31-25, paint all exterior plastic, missing globe on kitchen light fixture, missing receptacle cover. |
| 01/31/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 1-31-25, paint all exterior plastic, missing globe on kitchen light fixture, missing receptacle cover. |
| 01/31/2025 | RSBU - Building Final | N/A | Re-inspection required | 1-31-25, paint all exterior plastic, missing globe on kitchen light fixture, missing receptacle cover. |
| 02/04/2025 | ENGR Engineering Final | N/A | Partial Pass | Contractor did not know which unit was ready to be inspected at this time so I gave him a partial contractor. Will call him for another inspection tomorrow. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1123-01725
Permit Description: DUPLEX CASITA1X1 T20-M0044
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/14/2024 | COT - RSPL - Sewer | Passed | ||
| 05/14/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/21/2024 | COT - RSBU - Preslab | Passed | ||
| 05/21/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/14/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10-14-24, inspected and approved interior shear wall. Okay to tape and texture drywall. | |
| 11/01/2024 | BULD - Electrical Clearance | Passed | Two meters. | |
| 11/01/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 01/31/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1-31-25, previously inspected and approved. | |
| 01/31/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1-31-25, previously inspected. | |
| 01/31/2025 | COT - RSBU - Roof Nailing | Passed | 1-31-25, previously inspected. | |
| 01/31/2025 | COT - RSEL - Outdoor Lighting | Passed | 1-31-25, approved. | |
| 01/31/2025 | COT - RSME - Mechanical Final | Passed | 1-31-25, approved. | |
| 02/18/2025 | COT - RSEL - Electrical Final | Passed | 2-18-25, plumbing, mechanical, electrical, outdoor lighting, and building final approved. | |
| 02/18/2025 | COT - RSPL - Plumbing Final | Passed | 2-18-25, plumbing, mechanical, electrical, outdoor lighting, and building final approved. | |
| 02/18/2025 | RSBU - Building Final | Passed | 2-18-25, plumbing, mechanical, electrical, outdoor lighting, and building final approved. | |
| 02/24/2025 | ENGR Engineering Final | Passed | Building 86 and 88 pass |