Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
9125 E CATALINA HY
Apply Date:
11/06/2023
Applicant:
Description:
DUPLEX CASITA1X1 T20-M0044

Permit Reviews

Permit Number - TC-MDP-1123-01723
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Start Date Submittal Complete Date Status  
02/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/04/2025 APPROVED Review Details
03/05/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/07/2025 APPROVED Review Details
11/06/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/16/2023 APPROVED Review Details
07/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/01/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1123-01723
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044
Date Description Comments
11/06/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/06/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/06/2023 Masonry Inspection Report submittal review is required.
03/30/2023 Post-Tension Inspection Report is required.
11/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/06/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01723
Permite Description: DUPLEX CASITA1X1 T20-M0044
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/18/2024 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1123-01723
Permit Description: DUPLEX CASITA1X1 T20-M0044
Total Completed Inspections - 18
Date Description Inspector Results Comments
04/26/2024 COT - RSPL - Yard Water Line Passed
05/14/2024 COT - RSPL - Sewer Passed
05/14/2024 COT - RSPL - Rough Soil Passed
05/23/2024 COT - RSEL - Grounding/Bonding Passed
05/23/2024 COT - RSBU - Preslab Passed
05/23/2024 COT - RSEL - Electrical Underground Passed
05/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing are complete on this duplex units 81 & 83. Okay to proceed with installation of insulation and drywall.
10/18/2024 COT - RSBU - Interior Shear Bracing Passed
12/10/2024 BULD - Electrical Clearance Passed
02/12/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/12/2025 COT - RSBU - Roof Nailing Passed
02/12/2025 COT - RSEL - Electrical Final Passed This is for Duplex Units 81 & 83. Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/12/2025 COT - RSEL - Outdoor Lighting Passed This is for Duplex Units 81 & 83. Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/12/2025 COT - RSME - Mechanical Final Passed This is for Duplex Units 81 & 83. Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/12/2025 COT - RSPL - Plumbing Final Passed This is for Duplex Units 81 & 83. Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/12/2025 RSBU - Building Final Passed This is for Duplex Units 81 & 83. Construction is complete per plans. All mechanical, electrical, and plumbing fixtures are installed and fully operational. Smoke detectors are installed and tied together. Okay to issue Certificate of Occupancy.
02/20/2025 ENGR Engineering Final Passed Past bill 81 and 83