Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9750 E GRAY HAWK DR
Apply Date:
11/02/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35D Model Plan

Permit Reviews

Permit Number - TC-MDP-1123-01715
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35D Model Plan
Start Date Submittal Complete Date Status  
06/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/14/2024 APPROVED Review Details
11/03/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/13/2023 REQUIRES RESUBMIT Review Details
02/06/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 02/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1123-01715
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35D Model Plan
Total Outstanding Activity Conditions - 1
Date Name
11/13/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1123-01715
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35D Model Plan
Date Description Comments
11/03/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/03/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/13/2023 Post-Tension Inspection Report is required.
11/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/03/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01715
Permit Description: Casas del Cerrito H35D Model Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/19/2024 COT - RSPL - Backwater Valve Passed
04/19/2024 COT - RSPL - Rough Soil Passed
04/19/2024 COT - RSPL - Sewer Passed
04/19/2024 COT - RSPL - Yard Water Line Passed
04/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, footing is properly dug, masa clips are spaced properly on top of form, shear wall clips are installed per plans, rebar reinforcement is installed per plans, and post tension cabling is evenly spaced per the plans. Okay to pour concrete for footings and slab on grade.
04/26/2024 COT - RSBU - Preslab Passed Concrete forms are set, footing is properly dug, masa clips are spaced properly on top of form, shear wall clips are installed per plans, rebar reinforcement is installed per plans, and post tension cabling is evenly spaced per the plans. Okay to pour concrete for footings and slab on grade.
04/26/2024 COT - RSEL - Electrical Underground Passed Electrical conduit is installed underground for kitchen island.
04/26/2024 COT - RSEL - Grounding/Bonding Passed Ufer ground and ground rods are installed in the footing.
04/29/2024 BULD - Electrical Clearance Passed TEP ECO CLEARANCE ISSUED.
05/13/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Bottom plates are properly secured to concrete floor with shot pins, masa clips, or a/b bolts. Shear wall straps are properly secured with nails to the exterior framed walls. Okay to proceed.
05/13/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly installed and nailed to the top plate with H2.5 clips, plywood sheathing is properly installed to trusses with nails holding it down.
05/29/2024 COT - RSPL - Gas Pressure Test Passed
05/29/2024 RSBU - Building Progress Passed
05/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/13/2024 COT - RSBU - Interior Shear Bracing Passed
07/22/2024 COT - BULD - SWG Clearance Passed All gas valves are installed at gas appliance locations. SWG Clearance issued to Southwest Gas Company to install meter and turn on gas.
08/08/2024 COT - RSEL - Electrical Final Passed
08/08/2024 COT - RSEL - Outdoor Lighting Passed
08/08/2024 COT - RSME - Mechanical Final Passed
08/08/2024 COT - RSPL - Plumbing Final Passed
08/08/2024 RSBU - Building Final Passed
08/21/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
CDC 41 PT REPORT_V1.PDF DOCUMENTS VIEW
CDC 41 SIC-2024-06-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 41 D1_V1.PDF DOCUMENTS VIEW
CDC 41 SIC-2023-11-02_V1.PDF DOCUMENTS VIEW
CDC AVP RELEASE_V1.PDF DOCUMENTS VIEW