Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9757 E GRAY HAWK DR
Apply Date:
11/02/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35D Model Plan

Permit Reviews

Permit Number - TC-MDP-1123-01714
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35D Model Plan
Start Date Submittal Complete Date Status  
02/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/13/2024 APPROVED Review Details
11/03/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/13/2023 REQUIRES RESUBMIT Review Details
07/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/19/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1123-01714
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35D Model Plan
Date Description Comments
11/03/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/03/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/13/2023 Post-Tension Inspection Report is required.
11/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/03/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/13/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01714
Permit Description: Casas del Cerrito H35D Model Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/01/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is complete and connected to city sewer. Backwater valve is installed between clean outs. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
05/01/2024 COT - RSPL - Rough Soil Passed Underground plumbing is complete and connected to city sewer. Backwater valve is installed between clean outs. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
05/01/2024 COT - RSPL - Sewer Passed Underground plumbing is complete and connected to city sewer. Backwater valve is installed between clean outs. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
05/01/2024 COT - RSPL - Yard Water Line Passed Main water line is connected to the city water with a meter and is under street pressure. Okay to shade pipe and backfill trench.
05/09/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/09/2024 COT - RSBU - Preslab Passed
05/09/2024 COT - RSEL - Electrical Underground Passed
05/09/2024 COT - RSEL - Grounding/Bonding Passed
05/21/2024 BULD - Electrical Clearance Passed TEP ECO
05/28/2024 COT - RSBU - Roof Nailing Passed
05/29/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall throughout.
06/12/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15# of air pressure with no leaks. Okay to proceed.
06/12/2024 RSBU - Building Progress Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall throughout.
06/24/2024 COT - RSBU - Interior Shear Bracing Passed
07/31/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 7/31/2024
08/16/2024 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 COT - RSEL - Outdoor Lighting Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
09/05/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
CDC 7 SIC-2024-07-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 7 D1_V1.PDF DOCUMENTS VIEW
CDC 7 SIC-2023-11-02_V1.PDF DOCUMENTS VIEW
CDC AVP RELEASE_V1.PDF DOCUMENTS VIEW