Permit: TC-MDP-1123-01712
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9745 E GRAY HAWK DR
Address NEW:
9745 E GRAY HAWK DR
Apply Date:
11/02/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Plan
Permit Reviews
Permit Number - TC-MDP-1123-01712
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/06/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 02/13/2024 | APPROVED |
| 06/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/21/2024 | APPROVED |
| 11/03/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/13/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1123-01712
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Date | Description | Comments |
|---|---|---|
| 11/13/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/03/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/13/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/13/2023 | Post-Tension Inspection Report is required. | |
| 11/02/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/03/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01712
Permite Description: Casas del Cerrito H35B Plan
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 5/22/24: rips/holes in vapor barrier. DWV not under test. Vent too close to fresh air intake. Stud needed to support girder in front bedroom. All Top plate penetrations need to be fire foamed. Stopped inspection |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1123-01712
Permit Description: Casas del Cerrito H35B Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 04/12/2024 | COT - RSPL - Rough Soil | Passed | ||
| 04/12/2024 | COT - RSPL - Sewer | Passed | ||
| 04/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 04/19/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 04/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/19/2024 | COT - RSBU - Preslab | Passed | ||
| 04/19/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 05/03/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | All masa clips are properly secured to bottom plate. All j-bolts have a washer and nut tighten to bottom plate. Shear wall anchors are properly installed and secured to bottom plate. Straps are secured on large headers above doors and windows. Okay to proceed with other work. | |
| 05/03/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with H2.5 clips. Plywood sheathing is properly nailed to trusses per code. All rat runs and cross bracing is installed per truss calcs. Okay to proceed with top out of plumbing. | |
| 05/22/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/22/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/22/2024 | RSBU - Building Progress | Passed | ||
| 05/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/05/2024 | COT - RSBU - Interior Shear Bracing | Passed | 6/4/24: Drywall is properly installed and secured to studs per plan requirements for interior shear walls. Okay to proceed with tape, texture, and painting of ceilings and walls. | |
| 07/16/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 07/24/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and functional. Electrical panel is properly labeled and AFCI & GFCI breakers are installed. A/C unit has the correct size breaker installed. Okay to issue Certificate of Occupancy after all other departments inspections are completed. | |
| 07/24/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and functional. Electrical panel is properly labeled and AFCI & GFCI breakers are installed. A/C unit has the correct size breaker installed. Okay to issue Certificate of Occupancy after all other departments inspections are completed. | |
| 07/24/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and functional. Electrical panel is properly labeled and AFCI & GFCI breakers are installed. A/C unit has the correct size breaker installed. Okay to issue Certificate of Occupancy after all other departments inspections are completed. | |
| 07/24/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed per plan requirements and is fully operational. | |
| 07/24/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and functional. Electrical panel is properly labeled and AFCI & GFCI breakers are installed. A/C unit has the correct size breaker installed. Okay to issue Certificate of Occupancy after all other departments inspections are completed. | |
| 07/31/2024 | ENGR Engineering Final | Passed |