Permit: TC-MDP-1026-00868
Permit Details
Status:
In Review
Type:
Model Building Permit
Address:
4433 E SENECA ST
Address NEW:
4433 E SENECA ST
Apply Date:
10/16/2026
Applicant:
Description:
Seneca Model Home (Model Master Plan TC-MDP-0426-00239)
Permit Reviews
Permit Number - TC-MDP-1026-00868
Permit Status: In review
Permit Description: Seneca Model Home (Model Master Plan TC-MDP-0426-00239)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/22/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TC-MDP-1026-00868
Permit Status: In review
Permit Description: Seneca Model Home (Model Master Plan TC-MDP-0426-00239)
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 10/16/2026 | Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 10/16/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
| 10/16/2026 | Prior to Final - Required Documents - Submit the Manual J prior to Final Inspections. |
| 10/16/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/16/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 10/16/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 10/22/2026 | Prior to Issuance - Site Engineering has determined parcel(s) is located within a regulatory floodplain. The associated floodplain use permit TE-FPU-1026-00430 must be paid prior to issuance of this building permit. |