Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6272 S SPRUCE GOOSE AV
Apply Date:
10/24/2025
Applicant:
Celina Rodriguez
Description:
Cielo Reserves Plan 1015 (Model master plan TC-MDP-0625-00359)

Permit Reviews

Permit Number - TC-MDP-1025-00657
Permit Status: Inspections complete
Permit Description: Cielo Reserves Plan 1015 (Model master plan TC-MDP-0625-00359)
Start Date Submittal Complete Date Status  
10/24/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1025-00657
Permit Status: Inspections complete
Permit Description: Cielo Reserves Plan 1015 (Model master plan TC-MDP-0625-00359)
Total Outstanding Activity Conditions - 4
Date Name
10/09/2025 Post-Tension Inspection Report is required.
10/09/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/30/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/30/2025 Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-MDP-1025-00657
Permit Status: Inspections complete
Permit Description: Cielo Reserves Plan 1015 (Model master plan TC-MDP-0625-00359)
Date Description Comments
10/30/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/09/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/30/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00657
Permit Description: Cielo Reserves Plan 1015 (Model master plan TC-MDP-0625-00359)
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/18/2025 COT - RSPL - Yard Water Line Passed .
11/18/2025 COT - RSPL - Rough Soil Passed .
11/24/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
11/24/2025 COT - RSBU - Preslab Passed
11/24/2025 COT - RSEL - Electrical Underground Passed
12/04/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12.4.25
Framing verified per plans
Approved
12/04/2025 COT - RSBU - Roof Nailing Passed 12.4.25
Framing verified per plans
Approved
12/11/2025 BULD - Electrical Clearance Passed 12-11-25: okay to energize panel. ECO clearance issued to TEP.
12/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/17/2025
Approved. Added firefoam at penetrations throughout and shower under test.
12/17/2025 COT - RSPL - Gas Pressure Test Passed 12/17/2025
Approved, holding under test at 15psi.
12/17/2025 RSBU - Building Progress Passed
12/22/2025 COT - RSPL - Sewer Passed 12-22-25: HCS verified under test and per plans-okay to backfill with shading materials.
12/29/2025 COT - RSBU - Interior Shear Bracing Passed
02/03/2026 COT - BULD - SWG Clearance Passed Clear for code to SWG 2.3.26
02/10/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
02/17/2026 COT - RSEL - Outdoor Lighting Passed 2-17-26: outdoor lighting approved.
02/18/2026 COT - RSEL - Electrical Final Passed 2.18.26
Corrections made, approved
02/18/2026 COT - RSME - Mechanical Final Passed 2.18.26
Corrections made, approved
02/18/2026 COT - RSPL - Plumbing Final Passed 2.18.26
Corrections made, approved
02/18/2026 RSBU - Building Final Passed 2.18.26
Corrections made, approved