Permit: TC-MDP-1025-00651
Permit Details
Apply Date:
10/07/2025
Applicant:
Mark Alteri
Description:
PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Permit Reviews
Permit Number - TC-MDP-1025-00651
Permit Status: Complete
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/05/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/10/2025 | APPROVED |
| 03/05/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/05/2026 | REQUIRES RESUBMIT |
| 03/16/2026 | SPECIAL INSPECTION REVIEW v.2 | 03/16/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-1025-00651
Permit Status: Complete
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
| Date | Description | Comments |
|---|---|---|
| 11/05/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/05/2025 | Post-Tension Inspection Report is required. | |
| 10/07/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/07/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/05/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1025-00651
Permite Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Canceled | 1/27/26: Canceled by Contractor |
| 01/27/2026 | COT - RSBU - Roof Nailing | N/A | Canceled | 1/27/26: Canceled by Contractor |
| 06/09/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Electrical finish work not complete (receptacles hanging from walls by wires, no cover plates etc) |
| 06/09/2026 | RSBU - Building Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1025-00651
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2025 | COT - RSPL - Rough Soil | Passed | 12.17.25 Approved Lines verified Water under test Site is according to plan |
|
| 12/17/2025 | COT - RSPL - Sewer | Passed | 12.17.25 Approved Lines verified Water under test Site is according to plan |
|
| 12/17/2025 | COT - RSPL - Yard Water Line | Passed | 12.17.25 Approved Lines verified Water under test Site is according to plan |
|
| 12/22/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/22/2025 Approved per site plan. Verified setbacks, footing details and hold-down schedule. Okay for concrete placement. |
|
| 12/22/2025 | COT - RSBU - Preslab | Passed | 12/22/2025 Approved per site plan. Verified setbacks, footing details and hold-down schedule. UFER in place. Okay for concrete placement. |
|
| 12/22/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 02/05/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/05/2026 | COT - RSBU - Roof Nailing | Passed | OK to dry-in roof system | |
| 02/25/2026 | BULD - Electrical Clearance | Passed | Ok to set meter: CODE: ECO | |
| 03/16/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/17/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/17/2026 Corrections made to prior inspection. |
|
| 03/27/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/02/2026 | COT - BULD - SWG Clearance | Passed | ||
| 06/09/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/09/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 06/09/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/09/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/09/2026 | RSBU - Building Progress | Passed | ||
| 06/10/2026 | COT - RSEL - Electrical Final | Passed | 6.10.26 Approved corrections made |
|
| 06/10/2026 | RSBU - Building Final | Passed | 6.10.26 Approved corrections made |