Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address:
2735 S AYALA ST
Address NEW:
2735 S AYALA ST
Apply Date:
10/07/2025
Applicant:
Mark Alteri
Description:
PV 1882 SFR (Model master plan TC-MDP-0124-00059)

Permit Reviews

Permit Number - TC-MDP-1025-00651
Permit Status: Inspections
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Start Date Submittal Complete Date Status  
11/05/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/10/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1025-00651
Permit Status: Inspections
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Outstanding Activity Conditions - 2
Date Name
11/05/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/05/2025 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-1025-00651
Permit Status: Inspections
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Date Description Comments
10/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/05/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1025-00651
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Completed Inspections - 6
Date Description Inspector Results Comments
12/17/2025 COT - RSPL - Rough Soil Passed 12.17.25
Approved
Lines verified
Water under test
Site is according to plan
12/17/2025 COT - RSPL - Sewer Passed 12.17.25
Approved
Lines verified
Water under test
Site is according to plan
12/17/2025 COT - RSPL - Yard Water Line Passed 12.17.25
Approved
Lines verified
Water under test
Site is according to plan
12/22/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 12/22/2025
Approved per site plan. Verified setbacks, footing details and hold-down schedule. Okay for concrete placement.
12/22/2025 COT - RSBU - Preslab Passed 12/22/2025
Approved per site plan. Verified setbacks, footing details and hold-down schedule. UFER in place. Okay for concrete placement.
12/22/2025 COT - RSEL - Electrical Underground Passed

Documents

File Name Document Type  
PRL 29 PP FOR SUBMITTAL_V1.PDF DOCUMENTS VIEW
PRL 29 PT CERT-2025-11-04_V1.PDF DOCUMENTS VIEW