Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
1152 E LIGGINS ST
Apply Date:
10/21/2025
Applicant:
Mark Alteri
Description:
PV 1882 SFR (Model master plan TC-MDP-0124-00059)

Permit Reviews

Permit Number - TC-MDP-1025-00650
Permit Status: Complete
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Start Date Submittal Complete Date Status  
10/21/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/29/2025 APPROVED Review Details
01/29/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/29/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1025-00650
Permit Status: Complete
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Date Description Comments
10/27/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/27/2025 Post-Tension Inspection Report is required.
10/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/30/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1025-00650
Permite Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/24/2025 COT - RSPL - Yard Water Line N/A Re-inspection required 11.24.25
Muddy soil conditions - cannot verify leaks
Leak at main water line present
Stack not full
No plans on site
03/25/2026 COT - RSEL - Outdoor Lighting N/A Not Ready Not ready. Shear wall not ready. Missing drywall throughout. 3/25/2026

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1025-00650
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/25/2025 COT - RSPL - Backwater Valve Passed 11.25.25
Approved
11/25/2025 COT - RSPL - Rough Soil Passed
11/25/2025 COT - RSPL - Sewer Passed 11.25.25
Approved
12/02/2025 COT - RSEL - Electrical Underground Passed
12/02/2025 COT - RSBU - Preslab Passed Ensure slab area is termite treated.
12/02/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
01/13/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1.13.26
approved, proceed
01/13/2026 COT - RSBU - Roof Nailing Passed
03/09/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3.9.26
Approved
03/09/2026 COT - RSPL - Yard Water Line Passed
03/27/2026 COT - RSBU - Interior Shear Bracing Passed
05/19/2026 BULD - Electrical Clearance Passed 5/19/26:TEP ECO CLEARANCE approved
05/28/2026 COT - RSPL - Gas Pressure Test Passed
05/28/2026 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 5/28/2026
06/04/2026 COT - RSEL - Outdoor Lighting Passed 6-4-26: outdoor lighting approved.
06/04/2026 ENGR Engineering Final Passed
06/10/2026 COT - RSEL - Electrical Final Passed 6.10.26
Approved
06/10/2026 COT - RSME - Mechanical Final Passed
06/10/2026 COT - RSPL - Plumbing Final Passed 6.10.26
Approved
06/10/2026 RSBU - Building Final Passed 6.10.26
Approved