Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1025-00649
Permit Details
Status:
Needs Resubmittal
Type:
Model Building Permit
Address:
404 W PRESIDENT ST
Address NEW:
404 W PRESIDENT ST
Apply Date:
10/07/2025
Applicant:
Abraham Andraux
Description:
Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Permit Reviews
Permit Number - TC-MDP-1025-00649
Permit Status: Needs resubmittal
Permit Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/14/2025 | RESTAMP - RESIDENTIAL v.1 | 11/21/2025 | REQUIRES RESUBMIT |
| 11/06/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 11/14/2025 | APPROVED |
| 10/08/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 10/23/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1025-00649
Permit Status: Needs resubmittal
Permit Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/07/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 10/07/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 11/06/2025 | This project requires a Right-of-Way (ROW) permit issued by Department of Transportation and Mobility (DTM) prior to working in the public Right-of-Way. |
Conditions
Permit Number - TC-MDP-1025-00649
Permit Status: Needs resubmittal
Permit Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
| Date | Description | Comments |
|---|---|---|
| 10/22/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |