Permit: TC-MDP-1025-00629
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
2134 E SUPERSONIC ST
Address NEW:
2134 E SUPERSONIC ST
Apply Date:
03/09/2026
Applicant:
Celina Rodriguez
Description:
Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
Permit Reviews
Permit Number - TC-MDP-1025-00629
Permit Status: Inspections
Permit Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/12/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/20/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1025-00629
Permit Status: Inspections
Permit Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/17/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 03/17/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/02/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1025-00629
Permit Status: Inspections
Permit Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
| Date | Description | Comments |
|---|---|---|
| 10/02/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/02/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1025-00629
Permite Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 07/01/2026 | ENGR Engineering Final | N/A | Not Ready | Conditions required prior to final that are unsatisfied: Concrete installation - Special Inspections Epoxy Anchors - Special Inspections Post Tension Slab - Special Inspections HCS cap not glued correctly by driveway- it is loose and should not be tripping hazard. Cane Tree Stake needs to be removed |
| 07/01/2026 | RSBU - Building Final | N/A | Re-inspection required | 07/01/2026 Fill cavity and stucco above water heater flue terminal on outside wall. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1025-00629
Permit Description: Cielo Reserve 1262 SFR (Model master plan TC-MDP-0525-00297)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | COT - RSPL - Rough Soil | Passed | ||
| 04/02/2026 | COT - RSPL - Sewer | Passed | ||
| 04/02/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 04/08/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/08/2026 Approved per site plan and reinforcement. Okay to pour. |
|
| 04/08/2026 | COT - RSBU - Preslab | Passed | 04/08/2026 Approved per site plan and reinforcement. Okay to pour. |
|
| 04/15/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 04/15/2026 Verified corrections made in field: added anchor bolts and shot pins at marked locations, added h2.5 to A3 trusses, added HTT5 equivalent to SW11 in rear. |
|
| 04/15/2026 | COT - RSBU - Roof Nailing | Passed | 04/15/2026 Approved per plan. Added shot pins on interior sill plates 6" from edges at marked locations. Verified truss calls and roof nailing. |
|
| 04/30/2026 | BULD - Electrical Clearance | Passed | 04/30/2026 Clearance TEP ECO. |
|
| 04/30/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/30/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/30/2026 | RSBU - Building Progress | Passed | ||
| 05/13/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/12/2026 | COT - BULD - SWG Clearance | Passed | 06/12/2026 Clearance for Southwest Gas. |
|
| 07/01/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/01/2026 | COT - RSEL - Electrical Final | Passed | ||
| 07/01/2026 | COT - RSME - Mechanical Final | Passed | ||
| 07/01/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/02/2026 | RSBU - Building Final | Passed | 07/02/2026 Corrections made. |