Permit: TC-MDP-1025-00607
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6241 S SPRUCE GOOSE AV
Address NEW:
6241 S SPRUCE GOOSE AV
Apply Date:
12/09/2025
Applicant:
Celina Rodriguez
Description:
Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Permit Reviews
Permit Number - TC-MDP-1025-00607
Permit Status: Inspections complete
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/10/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 12/19/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1025-00607
Permit Status: Inspections complete
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 10/02/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/02/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 12/17/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 12/17/2025 | Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-1025-00607
Permit Status: Inspections complete
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
| Date | Description | Comments |
|---|---|---|
| 12/17/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1025-00607
Permit Description: Cielo Reserves 1740 Model Plan (Model master plan TC-MDP-0625-00360)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 12/24/2025 | COT - RSPL - Rough Soil | Passed | 12/24/2025 Approved per plan. All fixtures present and holding under test in clean trench - okay to backfill with shading materials. |
|
| 12/24/2025 | COT - RSPL - Sewer | Passed | 12/24/2025 Approved per plan. DWV holding under test in clean trench to HCS with green tracer wire - okay to backfill with shading materials. |
|
| 01/13/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 01/14/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 01/14/2026 Approved per site plan. |
|
| 01/14/2026 | COT - RSBU - Preslab | Passed | 01/14/2026 Approved, verified compaction and widened thickened slab at interior wall holdown. Ok for concrete placement. |
|
| 01/16/2026 | COT - RSPL - Yard Water Line | Passed | 01/16/2026 Approved and holding under test with blue tracer - ok to backfill with shading materials. |
|
| 01/20/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 01/22/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1.22.26 Corrections made, approved |
|
| 01/29/2026 | BULD - Electrical Clearance | Passed | 01/29/2026 Clearance TEP ECO. |
|
| 02/06/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2.6.26 approved |
|
| 02/06/2026 | COT - RSPL - Gas Pressure Test | Passed | 2.6.26 Approved |
|
| 02/06/2026 | RSBU - Building Progress | Passed | 2.6.26 Approved |
|
| 02/27/2026 | COT - RSBU - Interior Shear Bracing | Passed | 02/27/2026 Correction made to prior inspection. |
|
| 03/27/2026 | ENGR Engineering Final | Passed | ||
| 03/27/2026 | COT - BULD - SWG Clearance | Passed | 3.27.26 Approved for SWG clearance |
|
| 04/09/2026 | COT - RSEL - Electrical Final | Passed | ||
| 04/09/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/09/2026 | COT - RSME - Mechanical Final | Passed | ||
| 04/09/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 04/09/2026 | RSBU - Building Final | Passed |