Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
1133 E FORT LOWELL RD
Apply Date:
10/28/2024
Applicant:
CHARLES ELMER
Description:
SFR ALUM1585 T22-M0072

Permit Reviews

Permit Number - TC-MDP-1024-01260
Permit Status: Complete
Permit Description: SFR ALUM1585 T22-M0072
Start Date Submittal Complete Date Status  
10/30/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 11/18/2024 APPROVED Review Details
07/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/22/2025 APPROVED Review Details
12/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/03/2025 APPROVED Review Details
02/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/13/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-1024-01260
Permit Status: Complete
Permit Description: SFR ALUM1585 T22-M0072
Date Description Comments
10/25/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
02/13/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01260
Permite Description: SFR ALUM1585 T22-M0072
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
ENGR Engineering Final N/A Not Ready 1. Provide final elevation certificates for each unit to respective Floodplain Use Permit.
2. Request inspections for Development Package TD-DEV-1123-00465 – NONE have occurred to-date.
3. A revision to TD-DEV-1123-00465will be required to address site changes and include covered parking structures.
11/14/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
11/14/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable
11/14/2025 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01260
Permit Description: SFR ALUM1585 T22-M0072
Total Completed Inspections - 18
Date Description Inspector Results Comments
01/24/2025 COT - RSPL - Rough Soil Passed
01/31/2025 COT - RSEL - Grounding/Bonding Passed
01/31/2025 COT - RSBU - Preslab and floodplain Passed
01/31/2025 COT - RSEL - Electrical Underground Passed
01/31/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
02/19/2025 COT - RSBU - Roof Nailing Passed
02/19/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/13/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to insulate and cover walls.
05/08/2025 COT - RSPL - Sewer Passed
05/09/2025 COT - RSPL - Yard Water Line Passed
06/16/2025 BULD - Electrical Clearance Passed
07/10/2025 COT - RSME - Mechanical Final Passed
07/10/2025 COT - RSEL - Outdoor Lighting Passed
07/31/2025 RSBU - Building Final Passed
07/31/2025 ENGR Engineering Final Passed Site is safe and accessible. Revision required for associated development package. Okay for TCO level 4.
07/31/2025 COT - RSEL - Electrical Final Passed
11/14/2025 RSBU - Building Progress Passed
11/14/2025 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
CONS-1585 TRUSS LAYOUT AND CALCS 1133 L COPY_V1.PDF DOCUMENTS VIEW
FINAL ELEVATION CERTIFICATE - 1133 E FORT LOWELL RD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED DP_V1.PDF DOCUMENTS VIEW
CONS-SITE PLAN 1133_V1.PDF DOCUMENTS VIEW