Permit: TC-MDP-1024-01250
Permit Details
Apply Date:
10/28/2024
Applicant:
Frank Maldonado
Description:
Model Duplex
Permit Reviews
Permit Number - TC-MDP-1024-01250
Permit Status: Complete
Permit Description: Model Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/04/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/14/2024 | APPROVED |
| 03/13/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/13/2025 | APPROVED |
| 06/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/16/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01250
Permit Status: Complete
Permit Description: Model Duplex
| Date | Description | Comments |
|---|---|---|
| 03/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/23/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/15/2024 | Full payment needed prior to issuance of CofO. | |
| 10/23/2024 | Post-Tension Inspection Report is required. | |
| 10/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/06/2024 | A Special Inspections Certificate, with both Part A and Part B completed, must be submitted and reviewed prior to issuance of this permit. | |
| 12/04/2024 | Prior to project being finalized applicant must provide documentation of a finalized plat. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01250
Permite Description: Model Duplex
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | RSBU - Building Final | N/A | Re-inspection required | Install roof jacks. Coat PVC on roof. Install garage door hardware. Gfci receptacle right side not functioning. Attic receptacle needs to be gfci. Master bath has an open ground. Gfci receptacle in hall bath not functioning. 6/12/2025 |
| 06/13/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/13/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01250
Permit Description: Model Duplex
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2024 | COT - RSPL - Sewer | Passed | 11/18/24 Pass | |
| 11/18/2024 | COT - RSPL - Rough Soil | Passed | 11/18/24 Pass | |
| 11/22/2024 | COT - RSEL - Grounding/Bonding | Passed | 11/22/24 pass | |
| 11/22/2024 | COT - RSBU - Preslab | Passed | 11/22/24 pass | |
| 11/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11/22/24 pass | |
| 02/14/2025 | COT - RSBU - Roof Nailing | Passed | 2/14/25 corrections made ok to proceed to intermediate | |
| 02/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2/14/25 corrections made ok to proceed to intermediate | |
| 02/27/2025 | COT - RSPL - Yard Water Line | Passed | Passed 2/27/25 ok to backfill | |
| 03/19/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | 4/3/25: Shear-wall fasteners and drywall fasteners per plans ok to proceed with tape and mud. | |
| 05/09/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 05/13/2025 | BULD - Electrical Clearance | Passed | 5-13-25, panel okay to be energized. ECO clearance issued to TEP. | |
| 06/13/2025 | ENGR Engineering Final | Passed | ||
| 06/13/2025 | COT - RSEL - Electrical Final | Passed | ||
| 06/13/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/13/2025 | COT - RSME - Mechanical Final | Passed | ||
| 06/13/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 06/13/2025 | RSBU - Building Final | Passed | ||
| 06/13/2025 | RSBU - Building Progress | Passed | ||
| 06/13/2025 | COT - RSPL - Backwater Valve | Passed |