Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
10/24/2024
Applicant:
Paula Hinman
Description:
Blackhawk - T698 - Layla

Permit Reviews

Permit Number - TC-MDP-1024-01244
Permit Status: Inspections
Permit Description: Blackhawk - T698 - Layla
Start Date Submittal Complete Date Status  
10/28/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/14/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1024-01244
Permit Status: Inspections
Permit Description: Blackhawk - T698 - Layla
Total Outstanding Activity Conditions - 5
Date Name
10/23/2024 Post-Tension Inspection Report is required.
10/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/30/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/30/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/30/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-1024-01244
Permit Status: Inspections
Permit Description: Blackhawk - T698 - Layla
Date Description Comments
10/23/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/30/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1024-01244
Permite Description: Blackhawk - T698 - Layla
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/21/2025 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 1-21-25, add anchor bolt to marked locations on east side of home, add shot pins at marked locations, missing nails at garage shear wall, add nails to upstairs shear wall at marked locations, add nails to marked areas at upstairs plate to decking, properly nail down A-35s to top plate.STOPPED INSPECTION ADDITIONAL ITEMS MAY BE NOTED.
01/21/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 1-21-25, add anchor bolt to marked locations on east side of home, add shot pins at marked locations, missing nails at garage shear wall, add nails to upstairs shear wall at marked locations, add nails to marked areas at upstairs plate to decking, properly nail down A-35s to top plate.STOPPED INSPECTION ADDITIONAL ITEMS MAY BE NOTED.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1024-01244
Permit Description: Blackhawk - T698 - Layla
Total Completed Inspections - 12
Date Description Inspector Results Comments
12/20/2024 COT - RSPL - Sewer Passed 12/20/24 pass ok to back fill, shading is required.
12/20/2024 COT - RSPL - Rough Soil Passed 12/20/24 pass ok to back fill, shading is required.
12/20/2024 COT - RSPL - Yard Water Line Passed 12/20/24 pass ok to back fill, shading is required.
01/08/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar and hold downs per plan, ground compacted, ok to pour concrete 1/8/25
01/08/2025 COT - RSBU - Preslab Passed Rebar and hold downs per plan, ground compacted, ok to pour concrete 1/8/25
01/08/2025 COT - RSEL - Electrical Underground Passed Rebar and hold downs per plan, ground compacted, ok to pour concrete 1/8/25
01/27/2025 COT - RSBU - Exterior Clips/Sheathing Passed 1/27/25 corrections have been made. PASS
02/20/2025 COT - RSBU - Roof Nailing Passed 2/19/25 pass
02/20/2025 BULD - Electrical Clearance Passed 2/19/25 approval for TEP ECO
02/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/19/25 pass
02/20/2025 COT - RSEL - Grounding/Bonding Passed 2/19/25 pass
02/20/2025 COT - RSPL - Gas Pressure Test Passed 2/19/25 pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLACKHAWK RANCH LOT 37-START_10.08.24_V1.PDF DOCUMENTS VIEW
TC-MDP-0923-01492 BLACKHAWK- T698_SIC - LOT 37_6101 E CAMPOLINA TR-2024-10-24_V1.PDF DOCUMENTS VIEW