Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1024-01238
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4739 E JULIAN WASH DR
Address NEW:
4739 E JULIAN WASH DR
Apply Date:
10/25/2024
Applicant:
Dana Petty
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-1024-01238
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/02/2025 | REQUIRES RESUBMIT |
| 10/28/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/14/2024 | APPROVED |
| 05/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/08/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01238
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
| Date | Description | Comments |
|---|---|---|
| 10/21/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/30/2024 | Post-Tension Inspection Report is required. | |
| 10/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/30/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 10/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01238
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 3-20-25, add anchor bolts to marked location on north side of foyer area, add 2 a/b's at marked locations at dining room exterior wall and another at garage shear wall south end, add shot pin to mark location at first level, missing nails at exterior dining shear wall and along edge of south garage sheathing, |
| 03/10/2025 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | 10 Mar 25 Partial pass for UFER. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01238
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 03/04/2025 | COT - RSPL - Sewer | Passed | 4 March 25 Pass |
|
| 03/04/2025 | COT - RSPL - Rough Soil | Passed | 4 March 25 Pass |
|
| 03/10/2025 | COT - RSBU - Preslab | Passed | 10 Mar 25 Pass |
|
| 03/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10 Mar 25 Pass |
|
| 03/10/2025 | COT - RSEL - Electrical Underground | Passed | 10 Mar 25 Pass |
|
| 03/20/2025 | COT - RSBU - Roof Nailing | Passed | 3-20-25, okay to dry in roof. | |
| 03/24/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 3/24/25 corrections made | |
| 04/02/2025 | BULD - Electrical Clearance | Passed | 2 April 25 TEP ELECTRICAL CLEARANCE: ECO |
|
| 04/02/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/03/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/14/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/21/2025 | COT - BULD - SWG Clearance | Passed | 5-21-25, okay for installation of service. Clearance issued to SWG. | |
| 06/03/2025 | COT - RSEL - Electrical Final | Passed | 6-3-25: electrical final approved. | |
| 06/03/2025 | COT - RSEL - Outdoor Lighting | Passed | 6-3-25: outdoor lighting approved. | |
| 06/03/2025 | COT - RSME - Mechanical Final | Passed | 6-3-25: mechanical final approved. | |
| 06/03/2025 | COT - RSPL - Plumbing Final | Passed | 6-3-25: plumbing final approved. | |
| 06/03/2025 | ENGR Engineering Final | Passed | ||
| 06/03/2025 | RSBU - Building Final | Passed | 6-3-25: building final approved. | |
| 06/03/2025 | RSBU - Building Progress | Passed |