Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4687 E JULIAN WASH DR
Apply Date:
11/08/2024
Applicant:
Dana Petty
Description:
SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)

Permit Reviews

Permit Number - TC-MDP-1024-01232
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Start Date Submittal Complete Date Status  
11/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/05/2024 APPROVED Review Details
10/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/22/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01232
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Date Description Comments
10/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/18/2024 Post-Tension Inspection Report is required.
10/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01232
Permite Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready DWV not on test. Tub not under test. Remove pex from can lights min of 12". Throughout. Remove drywall screws from fan boxes. Stopped inspection other items may apply. 9/9/2025

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01232
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/06/2025 COT - RSPL - Rough Soil Passed Okay to backfill. Shading material is required. 8/6/2025
08/06/2025 COT - RSPL - Sewer Passed Okay to backfill. Shading material is required. 8/6/2025
08/06/2025 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading material is required. 8/6/2025
08/12/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Excavation/reinforcement verified per plans. Okay for concrete placement.
08/12/2025 COT - RSBU - Preslab Passed 8-12-25: preslab/Excavation/reinforcement verified per plans. Okay for concrete placement.
08/12/2025 COT - RSEL - Electrical Underground Passed 8-12-25: electrical underground approved.
08/29/2025 COT - RSBU - Roof Nailing Passed 8.29.2025
Corrections made to prior 8.22.2025 inspection as well as beam and sill plate replaced. Continued on second floor and roof.
08/29/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 8.29.2025
Corrections made to prior 8.22.2025 inspection as well as beam and sill plate replaced. Continued on second floor and roof.
09/09/2025 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/9/2025
09/09/2025 COT - RSEL - Grounding/Bonding Passed
09/09/2025 COT - RSPL - Gas Pressure Test Passed
09/09/2025 RSBU - Building Progress Passed
09/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9.11.25
APPROVED
09/22/2025 COT - RSBU - Interior Shear Bracing Passed
10/22/2025 COT - BULD - SWG Clearance Passed 10.22.2025
Clearance to SW Gas.
10/28/2025 COT - RSEL - Electrical Final Passed
10/28/2025 COT - RSEL - Outdoor Lighting Passed
10/28/2025 COT - RSME - Mechanical Final Passed
10/28/2025 COT - RSPL - Plumbing Final Passed
10/28/2025 ENGR Engineering Final Passed
10/28/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720- VALENCIA CROSSING- LOT 122- PT-2025-10-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 122 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 122 SPECIAL INSPECTION CERTIFICATE-2024-11-08_V1.PDF DOCUMENTS VIEW