SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)

Permit Reviews

Permit Number - TC-MDP-1024-01231
Permit Status: Inspections complete
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Start Date Submittal Complete Date Status  
06/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/23/2025 APPROVED Review Details
11/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/05/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01231
Permit Status: Inspections complete
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Date Description Comments
10/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/18/2024 Post-Tension Inspection Report is required.
10/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1024-01231
Permite Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/09/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass
07/08/2025 RSBU - Building Final N/A Re-inspection required 7-8-25: missing post tension tag on hose bib, paint all exterior plastics, properly install light at front porch, door bell not working, missing receptacle cover at hallway closet together with another at garage, gcfi receptacle tied into breaker light at garage-not per plans.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1024-01231
Permit Description: SFR MERI213021 T21-M0065 (Model master plan TC-MDP-0223-00546)
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/27/2025 COT - RSPL - Backwater Valve Passed
03/27/2025 COT - RSPL - Rough Soil Passed
03/27/2025 COT - RSPL - Sewer Passed
03/27/2025 COT - RSPL - Yard Water Line Passed
04/07/2025 COT - RSEL - Electrical Underground Passed
04/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
04/09/2025 COT - RSBU - Preslab Passed
04/16/2025 COT - RSBU - Roof Nailing Passed
04/23/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4-23-25, exterior clips/sheathing approved. Okay to continue with construction.
05/05/2025 BULD - Electrical Clearance Passed 5/5/25: TEP ECO CLEARANCE
05/05/2025 COT - RSPL - Gas Pressure Test Passed
05/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/23/2025 COT - RSBU - Interior Shear Bracing Passed 5-23-25, interior shear bracing approved. Okay to tape & texture drywall.
06/26/2025 COT - RSEL - Grounding/Bonding Passed
06/26/2025 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 6/26/2025
07/08/2025 COT - RSME - Mechanical Final Passed 7-8-25: mechanical final approved.
07/09/2025 COT - RSEL - Outdoor Lighting Passed 7-9-25: approved
07/09/2025 ENGR Engineering Final Passed Site is safe and complete in accordance with approved plans.
07/09/2025 RSBU - Building Progress Passed
07/10/2025 COT - RSEL - Electrical Final Passed 7-10-25: electrical final approved.
07/10/2025 COT - RSPL - Plumbing Final Passed 7-10-25: plumbing final approved.
07/10/2025 RSBU - Building Final Passed 7-10-25: building final approved.

Documents

File Name Document Type  
241720 - VALENCIA CROSSING PH 2 - LOT 115 - PT REPORT-2025-06-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 115 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 115 SPECIAL INSPECTION CERTIFICATE-2024-11-08_V1.PDF DOCUMENTS VIEW