Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
4120 S 12TH AV
Address NEW:
4120 S 12TH AV
Apply Date:
01/09/2025
Applicant:
David Evans
Description:
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)

Permit Reviews

Permit Number - TC-MDP-1024-01213
Permit Status: Complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Start Date Submittal Complete Date Status  
01/16/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 01/31/2025 REQUIRES RESUBMIT Review Details
02/04/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 02/12/2025 APPROVED Review Details
02/12/2025 RESTAMP - RESIDENTIAL v.1 02/14/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01213
Permit Status: Complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Date Description Comments
01/16/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/13/2025 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
10/15/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01213
Permite Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
03/13/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled 3-13-25, canceled by contractor
03/13/2025 COT - RSBU - Interior Shear Bracing N/A Canceled 3-13-25, canceled by contractor
06/20/2025 COT - BULD - SWG Clearance N/A Not Applicable
06/20/2025 COT - RSEL - Electrical Underground N/A Not Applicable
06/20/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01213
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Completed Inspections - 18
Date Description Inspector Results Comments
02/20/2025 COT - RSPL - Rough Soil Passed 2/20/25: plumbing underground per plans ok to proceed with backfill. Shading required
02/21/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 2/21/25 pass
02/21/2025 COT - RSBU - Preslab Passed 2/21/25 pass
02/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 2/27/25 ok to proceed to intermediate stage
02/27/2025 COT - RSBU - Roof Nailing Passed Passed 2/27/25 ok to proceed to intermediate stage
03/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3-14-25, approved.
03/14/2025 COT - RSBU - Interior Shear Bracing Passed 3-14-25, approved. Okay to continue with construction
05/13/2025 COT - RSEL - Grounding/Bonding Passed 5-13-25, grounding/bonding approved.
05/13/2025 COT - RSPL - Yard Water Line Passed 5-13-25, main water line verified under pressure-okay to backfill with shading materials.
05/19/2025 BULD - Electrical Clearance Passed 5-19-25, panel is okay to be energized. ECO clearance issued to TEP.
06/18/2025 COT - RSPL - Sewer Passed 6-18-25: approved
06/20/2025 RSBU - Building Progress Passed
06/20/2025 COT - RSEL - Outdoor Lighting Passed
06/24/2025 COT - RSEL - Electrical Final Passed
06/24/2025 COT - RSME - Mechanical Final Passed
06/24/2025 COT - RSPL - Plumbing Final Passed
06/24/2025 RSBU - Building Final Passed 6/20/25: ARC-FAULT receptacles required throughout, kitchen counter top receptacle spacing not code complaint, clean out in wall must be cut and capped, exterior plastic piping must be coated for UV protection, high loop at dishwasher required, cover plate required at microwave receptacle in east bedroom, pending other inspections, address must be installed and visible at final inspection, drywall patch must be complete at water heater room. STOPPED INSPECTION MORE ITEMS MAY BE ADDED
6/24/25: corrections made. Pending engineering final.
06/25/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
4120 12TH R4_V2.PDF DOCUMENTS VIEW