Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/11/2024
Applicant:
Andrea Flood
Description:
SFR RKK35L T21-M0084 REVISION-Structural changes

Permit Reviews

Permit Number - TC-MDP-1024-01209
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Start Date Submittal Complete Date Status  
02/05/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/05/2025 APPROVED Review Details
01/16/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/04/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1024-01209
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Outstanding Activity Conditions - 2
Date Name
01/28/2025 Soil Inspection required
10/15/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1024-01209
Permit Status: Inspections complete
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Date Description Comments
01/16/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/15/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1024-01209
Permite Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/11/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 11 Mar 25
1. Partial Pass for UFER

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1024-01209
Permit Description: SFR RKK35L T21-M0084 REVISION-Structural changes
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/27/2025 COT - RSPL - Rough Soil Passed
02/27/2025 COT - RSPL - Yard Water Line Passed
02/27/2025 COT - RSPL - Sewer Passed
03/11/2025 COT - RSBU - Preslab Passed 11 Mar 25
1. Pass
03/11/2025 COT - RSEL - Electrical Underground Passed 11 Mar 25
1. Pass
03/11/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/26/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/26/2025 COT - RSBU - Roof Nailing Passed
04/11/2025 BULD - Electrical Clearance Passed 11 April 25
TEP CLEARANCE:ECO
04/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/11/2025 COT - RSPL - Gas Pressure Test Passed
04/29/2025 COT - RSBU - Interior Shear Bracing Passed
04/29/2025 COT - RSEL - Grounding/Bonding Passed
06/09/2025 COT - BULD - SWG Clearance Passed 6-9-25: okay for SWG to install meter. Clearance issued.
06/09/2025 ENGR Engineering Final Passed CO Ready
06/20/2025 COT - RSEL - Electrical Final Passed
06/20/2025 COT - RSEL - Outdoor Lighting Passed
06/20/2025 COT - RSME - Mechanical Final Passed
06/20/2025 COT - RSPL - Plumbing Final Passed
06/20/2025 RSBU - Building Final Passed
06/20/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-01-14_V1.PDF DOCUMENTS VIEW
2_SITEPLAN_V2.PDF DOCUMENTS VIEW