Permit Reviews

Permit Number - TC-MDP-1024-01200
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Start Date Submittal Complete Date Status  
07/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/30/2025 APPROVED Review Details
11/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/05/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01200
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Date Description Comments
10/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/18/2024 Post-Tension Inspection Report is required.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01200
Permit Description: SFR MERI156021 T21-M0063 (Model Master Plan TC-MDP-0123-00387)
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/03/2025 COT - RSPL - Backwater Valve Passed 6-3-25: backwater valve,sewer connection, underground plumbing approved. Okay to backfill,with shading materials.
06/03/2025 COT - RSPL - Rough Soil Passed 6-3-25: sewer connection, underground plumbing approved. Okay to backfill,with shading materials.
06/03/2025 COT - RSPL - Sewer Passed 6-3-25: sewer connection, underground plumbing approved. Okay to backfill,with shading materials.
06/10/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 6-10-25: preslab, excavation/reinforcement and setbacks approved. Okay to pour concrete.
06/10/2025 COT - RSBU - Preslab Passed 6-10-25: preslab, excavation/reinforcement and setbacks approved. Okay to pour concrete.
06/10/2025 COT - RSEL - Electrical Underground Passed 6-10-25: electrical underground approved.
06/12/2025 COT - RSPL - Yard Water Line Passed
06/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/20/2025 COT - RSBU - Roof Nailing Passed
07/08/2025 COT - RSPL - Gas Pressure Test Passed 6.8.25
Proper amount of circuits observed. Proper firefoam/fireblock verified. Water in system. Gas under test. Fixtures and receptacles verified per plans.
07/08/2025 COT - RSEL - Grounding/Bonding Passed 6.8.25
Proper amount of circuits observed. Proper firefoam/fireblock verified. Water in system. Gas under test. Fixtures and receptacles verified per plans.
07/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6.8.25
Proper amount of circuits observed. Proper firefoam/fireblock verified. Water in system. Gas under test. Fixtures and receptacles verified per plans.
07/08/2025 RSBU - Building Progress Passed 6.8.25
Proper amount of circuits observed. Proper firefoam/fireblock verified. Water in system. Gas under test. Fixtures and receptacles verified per plans.
07/21/2025 COT - RSBU - Interior Shear Bracing Passed 7-21-25: interior shear inspection approved. Okay to tape & texture.
08/05/2025 BULD - Electrical Clearance Passed 6.8.25
Proper amount of circuits observed. Proper firefoam/fireblock verified. Water in system. Gas under test. Fixtures and receptacles verified per plans.
8/4/25: ECO
08/22/2025 COT - BULD - SWG Clearance Passed 8.22.25
Approved for SWG clearance
08/27/2025 COT - RSEL - Electrical Final Passed
08/27/2025 COT - RSEL - Outdoor Lighting Passed
08/27/2025 COT - RSME - Mechanical Final Passed
08/27/2025 COT - RSPL - Plumbing Final Passed
08/27/2025 ENGR Engineering Final Passed
08/27/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720 VALENCIA CROSSING LOT 118 PT-2025-07-23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 118 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 118 SPECIAL INSPECTION CERTIFICATE-2024-11-08_V1.PDF DOCUMENTS VIEW