Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4742 E JULIAN WASH DR
Apply Date:
10/15/2024
Applicant:
Description:
SFR MERI156021 T21-M0063

Permit Reviews

Permit Number - TC-MDP-1024-01199
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
10/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/04/2024 APPROVED Review Details
03/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/17/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01199
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
10/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/21/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/21/2024 Post-Tension Inspection Report is required.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/21/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01199
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/26/2025 COT - BULD - SWG Clearance N/A Re-inspection required 26 March 25
No access to building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01199
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/18/2024 COT - RSPL - Yard Water Line Passed 12/18/24 PASS OK to backfill, SHADING required.
12/18/2024 COT - RSPL - Sewer Passed 12/18/24 PASS OK to backfill, SHADING required.
12/18/2024 COT - RSPL - Rough Soil Passed 12/18/24 PASS OK to backfill, SHADING required.
12/18/2024 COT - RSPL - Plumbing Final Passed 12/18/24 PASS OK to backfill, SHADING required.
12/18/2024 COT - RSPL - Backwater Valve Passed 12/18/24 PASS OK to backfill, SHADING required.
12/30/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar and hold downs per plan, ok to pour concrete 12/30/24
12/30/2024 COT - RSBU - Preslab Passed Rebar and hold downs per plan, ok to pour concrete 12/30/24
12/30/2024 COT - RSEL - Electrical Underground Passed Rebar and hold downs per plan, ok to pour concrete 12/30/24
12/30/2024 COT - RSEL - Grounding/Bonding Passed No
01/15/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/15/25 corrections made
01/15/2025 COT - RSBU - Roof Nailing Passed 1/15/25 corrections made
02/03/2025 BULD - Electrical Clearance Passed Passed, gas held pressure 2/3/25 CLEARANCE ECO
02/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed, gas held pressure 2/3/25
02/03/2025 COT - RSPL - Gas Pressure Test Passed Passed, gas held pressure 2/3/25
02/13/2025 COT - RSBU - Interior Shear Bracing Passed Passed interior shear 2/13/25
03/28/2025 COT - BULD - SWG Clearance Passed 28 March 25
SOUTHWEST GAS CLEARANCE: SWG
04/14/2025 COT - RSEL - Outdoor Lighting Passed
04/14/2025 COT - RSME - Mechanical Final Passed
04/14/2025 ENGR Engineering Final Passed
04/14/2025 RSBU - Building Progress Passed
04/15/2025 COT - RSEL - Electrical Final Passed 4/15/25 passed final
04/15/2025 RSBU - Building Final Passed 4/15/25 passed final

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
2417720-VALENCIA CROSSING PH 2-LOT 131-FINAL PT-2025-03-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 131 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 131 SPECIAL INSPECTION CERTIFICATE-2024-10-15_V1.PDF DOCUMENTS VIEW