Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4735 E JULIAN WASH DR
Apply Date:
10/25/2024
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063

Permit Reviews

Permit Number - TC-MDP-1024-01195
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
10/28/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/14/2024 APPROVED Review Details
05/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/05/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01195
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
10/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/29/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/29/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/29/2024 Post-Tension Inspection Report is required.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/29/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/29/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01195
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/25/2025 COT - RSPL - Yard Water Line Passed 2/25/25: plumbing underground/ MWL per plans and under test, sewer connection passed. Ok to proceed with backfill. Shading required.
02/25/2025 COT - RSPL - Sewer Passed 2/25/25: plumbing underground per plans and under test, sewer connection passed. Ok to proceed with backfill. Shading required.
02/25/2025 COT - RSPL - Rough Soil Passed 2/25/25: plumbing underground per plans and under test, sewer connection passed. Ok to proceed with backfill. Shading required.
03/07/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/07/2025 COT - RSBU - Preslab Passed
03/07/2025 COT - RSEL - Electrical Underground Passed
03/07/2025 COT - RSEL - Grounding/Bonding Passed
03/18/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 3/18/25 ok to proceed to intermediate
03/18/2025 COT - RSBU - Roof Nailing Passed Passed 3/18/25 ok to proceed to intermediate
05/05/2025 BULD - Electrical Clearance Passed 2 April 25
TEP CLEARANCE: ECO
04/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/02/2025 COT - RSPL - Gas Pressure Test Passed
04/14/2025 COT - RSBU - Interior Shear Bracing Passed
05/21/2025 COT - BULD - SWG Clearance Passed 5-21-25, okay for installation of service. Clearance issued to SWG.
05/30/2025 COT - RSEL - Outdoor Lighting Passed 5-30-25: outdoor lighting approved.
05/30/2025 ENGR Engineering Final Passed Yard gate missing and sidewalk should be cleaned of debris from property to north.
06/03/2025 COT - RSEL - Electrical Final Passed 6-3-25: electrical final approved.
06/03/2025 COT - RSME - Mechanical Final Passed 6-3-25: mechanical final approved.
06/03/2025 COT - RSPL - Plumbing Final Passed 6-3-25: plumbing final approved.
06/03/2025 RSBU - Building Final Passed 6-3-25: building final approved.
06/03/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720 - VALENCIA CROSSING - 241720 - LOT 110 - PT REPORT-2025-04-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 110 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 110 SPECIAL INSPECTION CERTIFICATE-2024-10-25_V1.PDF DOCUMENTS VIEW