Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4699 E JULIAN WASH DR
Apply Date:
11/08/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)

Permit Reviews

Permit Number - TC-MDP-1024-01194
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Start Date Submittal Complete Date Status  
07/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/30/2025 APPROVED Review Details
11/14/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/03/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01194
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Date Description Comments
10/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/18/2024 Post-Tension Inspection Report is required.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/18/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01194
Permite Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
08/27/2025 COT - RSEL - Electrical Final N/A Canceled 8.27.2025
Cancelled per contractor.
08/27/2025 COT - RSEL - Outdoor Lighting N/A Canceled 8.27.2025
Cancelled per contractor.
08/27/2025 COT - RSME - Mechanical Final N/A Canceled 8.27.2025
Cancelled per contractor.
08/27/2025 COT - RSPL - Plumbing Final N/A Canceled 8.27.2025
Cancelled per contractor.
08/27/2025 RSBU - Building Final N/A Canceled 8.27.2025
Cancelled per contractor.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01194
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/03/2025 COT - RSPL - Rough Soil Passed 6-3-25: underground plumbing approved. Okay to backfill,with shading materials.
06/03/2025 COT - RSPL - Sewer Passed 6-3-25: sewer connection, underground plumbing approved. Okay to backfill,with shading materials.
06/03/2025 COT - RSPL - Yard Water Line Passed 6-3-25: main water line approved.
06/10/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 6-10-25: preslab, excavation/reinforcement and setbacks approved. Okay to pour concrete.
06/10/2025 COT - RSBU - Preslab Passed 6-10-25: preslab, excavation/reinforcement and setbacks approved. Okay to pour concrete.
06/10/2025 COT - RSEL - Electrical Underground Passed 6-10-25: electrical underground approved.
06/20/2025 COT - RSBU - Roof Nailing Passed
06/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/08/2025 BULD - Electrical Clearance Passed 7-8-25: panel okay to be energized. ECO clearance issued to TEP.
07/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7-8-25: intermediates approved. Okay to continue construction.
07/08/2025 COT - RSEL - Grounding/Bonding Passed 7-8-25: grounding/bonding approved.
07/08/2025 COT - RSPL - Gas Pressure Test Passed 7-8-25: gas pressure test approved.
07/08/2025 RSBU - Building Progress Passed
07/22/2025 COT - RSBU - Interior Shear Bracing Passed 7-22-25: interior shear bracing approved. Okay to tape & texture.
08/22/2025 COT - BULD - SWG Clearance Passed 8.22.25
Approved
08/28/2025 COT - RSEL - Electrical Final Passed
08/28/2025 COT - RSEL - Outdoor Lighting Passed
08/28/2025 COT - RSME - Mechanical Final Passed
08/28/2025 COT - RSPL - Plumbing Final Passed
08/28/2025 RSBU - Building Final Passed
08/29/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720 VALENCIA CROSSING LOT 119- PT-2025-07-23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 119 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 119 SPECIAL INSPECTION CERTIFICATE-2024-11-08_V1.PDF DOCUMENTS VIEW