Permit: TC-MDP-1024-01194
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4699 E JULIAN WASH DR
Address NEW:
4699 E JULIAN WASH DR
Apply Date:
11/08/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Permit Reviews
Permit Number - TC-MDP-1024-01194
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/30/2025 | APPROVED |
| 11/14/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/03/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01194
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
| Date | Description | Comments |
|---|---|---|
| 10/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/18/2024 | Post-Tension Inspection Report is required. | |
| 10/14/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/18/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 11/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01194
Permite Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2025 | COT - RSEL - Electrical Final | N/A | Canceled | 8.27.2025 Cancelled per contractor. |
| 08/27/2025 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 8.27.2025 Cancelled per contractor. |
| 08/27/2025 | COT - RSME - Mechanical Final | N/A | Canceled | 8.27.2025 Cancelled per contractor. |
| 08/27/2025 | COT - RSPL - Plumbing Final | N/A | Canceled | 8.27.2025 Cancelled per contractor. |
| 08/27/2025 | RSBU - Building Final | N/A | Canceled | 8.27.2025 Cancelled per contractor. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01194
Permit Description: SFR MERI132021 T21-M0062 (Model master plan TC-MDP-0223-00478)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2025 | COT - RSPL - Rough Soil | Passed | 6-3-25: underground plumbing approved. Okay to backfill,with shading materials. | |
| 06/03/2025 | COT - RSPL - Sewer | Passed | 6-3-25: sewer connection, underground plumbing approved. Okay to backfill,with shading materials. | |
| 06/03/2025 | COT - RSPL - Yard Water Line | Passed | 6-3-25: main water line approved. | |
| 06/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6-10-25: preslab, excavation/reinforcement and setbacks approved. Okay to pour concrete. | |
| 06/10/2025 | COT - RSBU - Preslab | Passed | 6-10-25: preslab, excavation/reinforcement and setbacks approved. Okay to pour concrete. | |
| 06/10/2025 | COT - RSEL - Electrical Underground | Passed | 6-10-25: electrical underground approved. | |
| 06/20/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 06/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/08/2025 | BULD - Electrical Clearance | Passed | 7-8-25: panel okay to be energized. ECO clearance issued to TEP. | |
| 07/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7-8-25: intermediates approved. Okay to continue construction. | |
| 07/08/2025 | COT - RSEL - Grounding/Bonding | Passed | 7-8-25: grounding/bonding approved. | |
| 07/08/2025 | COT - RSPL - Gas Pressure Test | Passed | 7-8-25: gas pressure test approved. | |
| 07/08/2025 | RSBU - Building Progress | Passed | ||
| 07/22/2025 | COT - RSBU - Interior Shear Bracing | Passed | 7-22-25: interior shear bracing approved. Okay to tape & texture. | |
| 08/22/2025 | COT - BULD - SWG Clearance | Passed | 8.22.25 Approved |
|
| 08/28/2025 | COT - RSEL - Electrical Final | Passed | ||
| 08/28/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/28/2025 | COT - RSME - Mechanical Final | Passed | ||
| 08/28/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/28/2025 | RSBU - Building Final | Passed | ||
| 08/29/2025 | ENGR Engineering Final | Passed |