Permit: TC-MDP-1024-01186
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
288 N SUNNY COVE PL
Address NEW:
288 N SUNNY COVE PL
Apply Date:
10/29/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-1024-01186
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/15/2024 | APPROVED |
| 03/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/17/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01186
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Date | Description | Comments |
|---|---|---|
| 11/04/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/04/2024 | Post-Tension Inspection Report is required. | |
| 10/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01186
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 2-5-25, nail down rsp4 at shear wall northwest corner, add nails to same shear wall along edges, replace 2x6 stud directly west of kitchen island, and nail down a-35 to top plate -throughout. |
| 01/22/2025 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | 1-22-25, partial pass for ufer. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01186
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2025 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is complete and connected to main sewer line. Backwater valve is installed between the two clean outs. Green tracer wire installed from clean outs to main sewer line connection. Okay to shade pipes and backfill trenches. | |
| 01/15/2025 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and connected to main sewer line. Backwater valve is installed between the two clean outs. Green tracer wire installed from clean outs to main sewer line connection. Okay to shade pipes and backfill trenches. | |
| 01/15/2025 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and connected to main sewer line. Backwater valve is installed between the two clean outs. Green tracer wire installed from clean outs to main sewer line connection. Okay to shade pipes and backfill trenches. | |
| 01/17/2025 | COT - RSPL - Yard Water Line | Passed | Main water supply line is connected to city water meter and under street pressure with no leaks. Okay to proceed with shading pipe and backfilling trenches. | |
| 01/22/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1-22-25, excavation/rebar and setbacks verified. Okay to pour concrete. | |
| 01/22/2025 | COT - RSBU - Preslab | Passed | 1-22-25, preslab,excavation/rebar and setbacks verified. Okay to pour concrete. | |
| 01/22/2025 | COT - RSEL - Electrical Underground | Passed | 1-22-25, electrical under ground approved. | |
| 02/05/2025 | COT - RSBU - Roof Nailing | Passed | 2-5-25, roof nailing approved. Okay to dry in roof | |
| 02/06/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2-6-25, exterior clips/sheathing approved. Okay to continue with construction | |
| 02/26/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 02/26/2025 | BULD - Electrical Clearance | Passed | 26 FEB 25 TEP CLEARANCE:ECO. |
|
| 02/26/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/26/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/11/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/17/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 4/17/25 | |
| 05/01/2025 | COT - RSEL - Electrical Final | Passed | Passed final 5/1/25 | |
| 05/01/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 5/1/25 | |
| 05/01/2025 | COT - RSME - Mechanical Final | Passed | Passed final 5/1/25 | |
| 05/01/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 5/1/25 | |
| 05/01/2025 | RSBU - Building Final | Passed | Passed final 5/1/25 | |
| 05/01/2025 | RSBU - Building Progress | Passed | Passed final 5/1/25 | |
| 05/06/2025 | ENGR Engineering Final | Passed |