Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
288 N SUNNY COVE PL
Apply Date:
10/29/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-1024-01186
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
10/31/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/15/2024 APPROVED Review Details
03/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/17/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01186
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
11/04/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/04/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/04/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/04/2024 Post-Tension Inspection Report is required.
10/10/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/10/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/04/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01186
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/05/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 2-5-25, nail down rsp4 at shear wall northwest corner, add nails to same shear wall along edges, replace 2x6 stud directly west of kitchen island, and nail down a-35 to top plate -throughout.
01/22/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 1-22-25, partial pass for ufer.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01186
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/15/2025 COT - RSPL - Backwater Valve Passed Underground plumbing is complete and connected to main sewer line. Backwater valve is installed between the two clean outs. Green tracer wire installed from clean outs to main sewer line connection. Okay to shade pipes and backfill trenches.
01/15/2025 COT - RSPL - Rough Soil Passed Underground plumbing is complete and connected to main sewer line. Backwater valve is installed between the two clean outs. Green tracer wire installed from clean outs to main sewer line connection. Okay to shade pipes and backfill trenches.
01/15/2025 COT - RSPL - Sewer Passed Underground plumbing is complete and connected to main sewer line. Backwater valve is installed between the two clean outs. Green tracer wire installed from clean outs to main sewer line connection. Okay to shade pipes and backfill trenches.
01/17/2025 COT - RSPL - Yard Water Line Passed Main water supply line is connected to city water meter and under street pressure with no leaks. Okay to proceed with shading pipe and backfilling trenches.
01/22/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1-22-25, excavation/rebar and setbacks verified. Okay to pour concrete.
01/22/2025 COT - RSBU - Preslab Passed 1-22-25, preslab,excavation/rebar and setbacks verified. Okay to pour concrete.
01/22/2025 COT - RSEL - Electrical Underground Passed 1-22-25, electrical under ground approved.
02/05/2025 COT - RSBU - Roof Nailing Passed 2-5-25, roof nailing approved. Okay to dry in roof
02/06/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2-6-25, exterior clips/sheathing approved. Okay to continue with construction
02/26/2025 COT - RSEL - Grounding/Bonding Passed
02/26/2025 BULD - Electrical Clearance Passed 26 FEB 25

TEP CLEARANCE:ECO.
02/26/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/26/2025 COT - RSPL - Gas Pressure Test Passed
03/11/2025 COT - RSBU - Interior Shear Bracing Passed
04/17/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 4/17/25
05/01/2025 COT - RSEL - Electrical Final Passed Passed final 5/1/25
05/01/2025 COT - RSEL - Outdoor Lighting Passed Passed final 5/1/25
05/01/2025 COT - RSME - Mechanical Final Passed Passed final 5/1/25
05/01/2025 COT - RSPL - Plumbing Final Passed Passed final 5/1/25
05/01/2025 RSBU - Building Final Passed Passed final 5/1/25
05/01/2025 RSBU - Building Progress Passed Passed final 5/1/25
05/06/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
152956 PT LOT 151 COMPLETE-2025-03-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 151 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 151 SPECIAL INSPECTION CERTIFICATE-2024-10-29_V1.PDF DOCUMENTS VIEW