Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
304 N SUNNY COVE PL
Apply Date:
10/11/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-1024-01185
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
10/17/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/29/2024 APPROVED Review Details
01/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1024-01185
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
10/21/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/17/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/21/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/21/2024 Post-Tension Inspection Report is required.
10/10/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/10/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01185
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
01/07/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required Missing rsp4 clip at marked area, shop pins at marked area, add washer to bolt missing at entrance, add sister stud to damaged stud at bathroom
01/07/2025 COT - RSBU - Roof Nailing N/A Re-inspection required Missing rsp4 clip at marked area, shop pins at marked area, add washer to bolt missing at entrance, add sister stud to damaged stud at bathroom
04/10/2025 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1024-01185
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 21
Date Description Inspector Results Comments
12/12/2024 COT - RSPL - Backwater Valve Passed 12-12-24, backwater valve, sewer connection, underground plumbing verified as per approved plans. Okay to backfill with shading materials.
12/12/2024 COT - RSPL - Yard Water Line Passed 12-12-24, backwater valve, sewer connection, underground plumbing verified as per approved plans. Okay to backfill with shading materials.
12/12/2024 COT - RSPL - Rough Soil Passed 12-12-24, backwater valve, sewer connection, underground plumbing verified as per approved plans. Okay to backfill with shading materials.
12/12/2024 COT - RSPL - Sewer Passed 12-12-24, backwater valve, sewer connection, underground plumbing verified as per approved plans. Okay to backfill with shading materials.
12/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12/17/24 pass
12/17/2024 COT - RSBU - Preslab Passed 12/17/24 pass
12/17/2024 COT - RSEL - Grounding/Bonding Passed 12/17/24 pass
12/17/2024 COT - RSEL - Electrical Underground Passed 12/17/24 pass
01/09/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1-9-25, corrections made. Okay to continue construction.
01/09/2025 COT - RSBU - Roof Nailing Passed 1-9-25, corrections made. Okay to continue construction.
02/05/2025 BULD - Electrical Clearance Passed 2-5-25, panel okay to be energized. ECO clearance issued to TEP.
02/05/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2-5-25, residential intermediate inspection approved plans. Okay to continue with construction.
02/05/2025 COT - RSPL - Gas Pressure Test Passed 2-5-25, gas pressure test approved.
02/19/2025 COT - RSBU - Interior Shear Bracing Passed 2/19/25: Drywall is properly secured to studs per plan requirements for an interior shear wall. Okay to proceed with tape, texture, and paint.
03/24/2025 COT - BULD - SWG Clearance Passed 3-24-25, okay for SWG to install meter. Clearance issued.
04/01/2025 COT - RSME - Mechanical Final Passed Passed final 4/1/25
04/01/2025 COT - RSPL - Plumbing Final Passed Passed final 4/1/25
04/03/2025 COT - RSEL - Electrical Final Passed 4/3/25 corrections made
04/03/2025 COT - RSEL - Outdoor Lighting Passed 4/3/25 corrections made
04/03/2025 RSBU - Building Final Passed 4/3/25 corrections made
04/10/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
152345 PT LOT 149 COMPLETE-2025-01-30_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 149 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 149 SPECIAL INSPECTION CERTIFICATE-2024-10-11_V1.PDF DOCUMENTS VIEW