Permit: TC-MDP-1024-01183
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
255 N SUNNY COVE PL
Address NEW:
255 N SUNNY COVE PL
Apply Date:
12/05/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
Permit Reviews
Permit Number - TC-MDP-1024-01183
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/20/2024 | APPROVED |
| 11/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/06/2025 | APPROVED |
| 01/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2025 | REQUIRES RESUBMIT |
| 02/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/05/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01183
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
| Date | Description | Comments |
|---|---|---|
| 12/12/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 12/12/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/12/2024 | Post-Installed Anchor Inspection Report is required. | |
| 12/12/2024 | Post-Tension Inspection Report is required. | |
| 10/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/06/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01183
Permite Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2025 | RSBU - Building Final | N/A | Canceled | |
| 10/31/2025 | COT - RSEL - Electrical Final | N/A | Canceled | |
| 10/31/2025 | COT - RSEL - Outdoor Lighting | N/A | Canceled | |
| 10/31/2025 | COT - RSME - Mechanical Final | N/A | Canceled | |
| 10/31/2025 | COT - RSPL - Plumbing Final | N/A | Canceled | |
| 10/31/2025 | RSBU - Building Progress | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01183
Permit Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2025 | COT - RSPL - Rough Soil | Passed | Passed 8/13/25 | |
| 08/13/2025 | COT - RSPL - Backwater Valve | Passed | Passed 8/13/25 | |
| 08/13/2025 | COT - RSPL - Sewer | Passed | Passed 8/13/25 | |
| 08/13/2025 | COT - RSPL - Yard Water Line | Passed | Passed 8/13/25 | |
| 08/20/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 8.20.25 Passed Ok to pour |
|
| 08/20/2025 | COT - RSBU - Preslab | Passed | 8.20.25 Passed Ok to pour |
|
| 08/20/2025 | COT - RSEL - Electrical Underground | Passed | 8.20.25 Passed Ok to pour |
|
| 08/20/2025 | COT - RSEL - Grounding/Bonding | Passed | 8.20.25 Passed Ok to pour |
|
| 08/29/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/02/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 09/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 9/15/25 | |
| 09/15/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 9/15/25 | |
| 09/17/2025 | BULD - Electrical Clearance | Passed | 9.17.25 APPROVED |
|
| 09/29/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/30/2025 | COT - BULD - SWG Clearance | Passed | No meter on site. This is the last house on the West side of South Sunny Cove Pl. It is new construction. | |
| 10/31/2025 | ENGR Engineering Final | Passed | Site is clear and accessible. Engineering is okay for CofO. | |
| 11/03/2025 | RSBU - Building Final | Passed | ||
| 11/03/2025 | COT - RSEL - Electrical Final | Passed | ||
| 11/03/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/03/2025 | COT - RSME - Mechanical Final | Passed | ||
| 11/03/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 11/03/2025 | RSBU - Building Progress | Passed |