Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1024-01180
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
271 N SUNNY COVE PL
Address NEW:
271 N SUNNY COVE PL
Apply Date:
12/05/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
Permit Reviews
Permit Number - TC-MDP-1024-01180
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/05/2025 | APPROVED |
| 12/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/20/2024 | APPROVED |
| 06/20/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/23/2025 | APPROVED |
| 01/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1024-01180
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
| Date | Description | Comments |
|---|---|---|
| 12/13/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 12/12/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/13/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/31/2025 | Post-Installed Anchor Inspection Report is required. | |
| 12/13/2024 | Post-Tension Inspection Report is required. | |
| 10/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 06/23/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01180
Permit Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2025 | COT - RSPL - Backwater Valve | Passed | Passed 3/14/25 ok to backfill | |
| 03/14/2025 | COT - RSPL - Rough Soil | Passed | Passed 3/14/25 ok to backfill | |
| 03/14/2025 | COT - RSPL - Sewer | Passed | Passed 3/14/25 ok to backfill | |
| 03/14/2025 | COT - RSPL - Yard Water Line | Passed | Passed 3/14/25 ok to backfill | |
| 03/26/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 3/26/25 ok to pour concrete | |
| 03/26/2025 | COT - RSBU - Preslab | Passed | Passed 3/26/25 ok to pour concrete | |
| 03/26/2025 | COT - RSEL - Electrical Underground | Passed | Passed 3/26/25 ok to pour concrete | |
| 03/26/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 3/26/25 ok to pour concrete | |
| 04/07/2025 | COT - RSBU - Roof Nailing | Passed | Passed 4/7/25 | |
| 04/08/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/8/25 corrections made | |
| 04/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 4/25/25 | |
| 04/25/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 4/25/25 | |
| 04/25/2025 | BULD - Electrical Clearance | Passed | Passed 4/25/25 CLEARANCE ECO | |
| 05/09/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 5/8/25 | |
| 06/17/2025 | COT - BULD - SWG Clearance | Passed | SWG | |
| 06/18/2025 | COT - RSEL - Electrical Final | Passed | Passed final 6/18/25 | |
| 06/18/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 6/18/25 | |
| 06/18/2025 | COT - RSME - Mechanical Final | Passed | Passed final 6/18/25 | |
| 06/18/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 6/18/25 | |
| 06/18/2025 | RSBU - Building Final | Passed | Passed final 6/18/25 | |
| 06/18/2025 | RSBU - Building Progress | Passed | passed final 6/18/25 | |
| 06/20/2025 | ENGR Engineering Final | Passed |