Permit: TC-MDP-1024-01179
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
272 N SUNNY COVE PL
Address NEW:
272 N SUNNY COVE PL
Apply Date:
12/09/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
Permit Reviews
Permit Number - TC-MDP-1024-01179
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2025 | REQUIRES RESUBMIT |
| 12/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/24/2024 | APPROVED |
| 05/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/16/2025 | APPROVED |
| 02/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/05/2025 | APPROVED |
| 01/15/2025 | SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 | 01/17/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01179
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
| Date | Description | Comments |
|---|---|---|
| 12/17/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 12/17/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/17/2024 | Post-Installed Anchor Inspection Report is required. | |
| 12/17/2024 | Post-Tension Inspection Report is required. | |
| 10/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 05/16/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01179
Permite Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2025 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01179
Permit Description: SFR MER1402190 T21-M0078 (Model master plan TC-MDP-0223-00502)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2025 | COT - RSPL - Rough Soil | Passed | 2-20-25, underground plumbing, sewer connection, setbacks verified per approved plans. Okay to backfill with shading. | |
| 02/20/2025 | COT - RSPL - Sewer | Passed | 2-20-25, underground plumbing, main water line, sewer connection, setbacks verified per approved plans. Okay to backfill with shading. | |
| 02/20/2025 | COT - RSPL - Yard Water Line | Passed | 2-20-25, underground plumbing, main water line, sewer connection, setbacks verified per approved plans. Okay to backfill with shading. | |
| 02/25/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 02/25/2025 | COT - RSBU - Preslab | Passed | ||
| 02/25/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 02/25/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 03/07/2025 | COT - RSBU - Roof Nailing | Passed | 3-7-25, approved. Okay to continue with construction. | |
| 03/07/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 3-7-25, approved. Okay to continue with construction. | |
| 03/27/2025 | COT - RSPL - Gas Pressure Test | Passed | 3-27-25, approved | |
| 03/28/2025 | BULD - Electrical Clearance | Passed | ECO | |
| 03/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/09/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/22/2025 | COT - BULD - SWG Clearance | Passed | SWG. There is no existing meter at this location, thus no meter number to enter. This house is newly constructed, this has no previous gas service. The house is located on the East side of Sunny Cove Pl, South of 280 S Sunny Cove Pl ( also on the East side of Sunny Cove Pl). The house currently is painted mostly gray/brown with a white garage door. The gas piping for the meter location is on the South side of the garage. | |
| 05/23/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/23/2025 | COT - RSEL - Electrical Final | Passed | ||
| 05/23/2025 | COT - RSME - Mechanical Final | Passed | ||
| 05/23/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 05/23/2025 | RSBU - Building Final | Passed | ||
| 06/02/2025 | ENGR Engineering Final | Passed | Grading looks to be functional now. Site is in accordance with approved plans. CofO ready. |