Permit: TC-MDP-1024-01178
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
303 N SUNNY COVE PL
Address NEW:
303 N SUNNY COVE PL
Apply Date:
10/25/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-1024-01178
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/27/2025 | APPROVED |
| 10/28/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1024-01178
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Date | Description | Comments |
|---|---|---|
| 10/29/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/29/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/29/2024 | Post-Tension Inspection Report is required. | |
| 10/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1024-01178
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 12/23/2024 | COT - RSPL - Rough Soil | Passed | ||
| 12/23/2024 | COT - RSPL - Sewer | Passed | ||
| 12/23/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 01/07/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and hold downs per plan, ok to pour concrete 1/7/25 | |
| 01/07/2025 | COT - RSBU - Preslab | Passed | Rebar and hold downs per plan, ok to pour concrete 1/7/25 | |
| 01/07/2025 | COT - RSEL - Grounding/Bonding | Passed | Rebar and hold downs per plan, ok to pour concrete 1/7/25 | |
| 01/07/2025 | COT - RSEL - Electrical Underground | Passed | Rebar and hold downs per plan, ok to pour concrete 1/7/25 | |
| 01/16/2025 | COT - RSBU - Roof Nailing | Passed | 1-16-25, roof nailing approved.Okay to continue with construction. | |
| 01/16/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1-16-25, approved. Okay to continue with construction. | |
| 02/06/2025 | BULD - Electrical Clearance | Passed | 2-6-25, okay for panel to be energized. ECO clearance sent to TEP | |
| 02/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2-6-25, intermediates approved. Okay to continue with construction | |
| 02/06/2025 | COT - RSPL - Gas Pressure Test | Passed | 2-6-25, gas pressure test approved | |
| 02/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear drywall is properly secured to studs with screws per the plan requirements. Okay to proceed with tape, texture, and paint. | |
| 04/01/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 4/1/25 | |
| 04/11/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/11/25 CLEARANCE ECO | |
| 04/11/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/11/25 | |
| 04/11/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/11/25 | |
| 04/11/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/11/25 | |
| 04/11/2025 | RSBU - Building Final | Passed | Passed final 4/11/25 | |
| 04/11/2025 | RSBU - Building Progress | Passed | Passed final 4/11/25 | |
| 04/16/2025 | ENGR Engineering Final | Passed | Site is good. |