Permit: TC-MDP-1023-01710
Permit Details
Apply Date:
10/24/2023
Applicant:
Joshua Swinney
Description:
Arches Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01710
Permit Status: Issued
Permit Description: Arches Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2024 | APPROVED |
02/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/15/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1023-01710
Permit Status: Issued
Permit Description: Arches Model Plan
Date | Description | Comments |
---|---|---|
02/08/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
02/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/12/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/21/2024 | Post-Tension Inspection Report is required. | |
03/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
02/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/08/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/12/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
10/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-1023-01710
Permite Description: Arches Model Plan
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/06/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
08/06/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
11/20/2024 | COT - RSEL - Electrical Final | N/A | Canceled | 11-20-24, canceled by contractor. |
11/20/2024 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 11-20-24, canceled by contractor. |
11/20/2024 | COT - RSME - Mechanical Final | N/A | Canceled | 11-20-24, canceled by contractor. |
11/20/2024 | COT - RSPL - Plumbing Final | N/A | Canceled | 11-20-24, canceled by contractor. |
11/20/2024 | RSBU - Building Final | N/A | Canceled | 11-20-24, canceled by contractor. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-1023-01710
Permit Description: Arches Model Plan
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/18/2024 | COT - RSPL - Backwater Valve | Passed | ||
04/18/2024 | COT - RSPL - Rough Soil | Passed | ||
04/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed per plans, rebar reinforcement is in place per plans, shear wall straps are installed per plans, masa clips are installed and spaced properly on forms, all plumbing pipes are properly wrapped for protection, and Ufer ground is installed on garage side of house. Okay to pour concrete for footings and slab. | |
05/03/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed per plans, rebar reinforcement is in place per plans, shear wall straps are installed per plans, masa clips are installed and spaced properly on forms, all plumbing pipes are properly wrapped for protection, and Ufer ground is installed on garage side of house. Okay to pour concrete for footings and slab. | |
05/03/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is installed per plans, rebar reinforcement is in place per plans, shear wall straps are installed per plans, masa clips are installed and spaced properly on forms, all plumbing pipes are properly wrapped for protection, and Ufer ground is installed on garage side of house. Okay to pour concrete for footings and slab. | |
05/03/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed per plans, rebar reinforcement is in place per plans, shear wall straps are installed per plans, masa clips are installed and spaced properly on forms, all plumbing pipes are properly wrapped for protection, and Ufer ground is installed on garage side of house. Okay to pour concrete for footings and slab. | |
06/14/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/14/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/22/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/17/2024 | RSBU - Building Progress | Passed | ||
09/17/2024 | COT - RSPL - Sewer | Passed | ||
11/14/2024 | BULD - Electrical Clearance | Passed | 11-14-24, electrical panel approved to be energized. Clearance issued to TEP. | |
11/20/2024 | ENGR Engineering Final | Passed | CO Ready |