Permit: TC-MDP-1023-01707
Permit Details
Apply Date:
12/15/2023
Applicant:
Joshua Swinney
Description:
Indiana Dunes Model Plan La Escalera
Permit Reviews
Permit Number - TC-MDP-1023-01707
Permit Status: Complete
Permit Description: Indiana Dunes Model Plan La Escalera
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/11/2024 | REQUIRES RESUBMIT |
12/15/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/26/2023 | APPROVED |
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/19/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1023-01707
Permit Status: Complete
Permit Description: Indiana Dunes Model Plan La Escalera
Date | Description | Comments |
---|---|---|
09/11/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
12/15/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/19/2023 | Post-Tension Inspection Report is required. | |
09/11/2024 | Post-Tension Inspection Report is required. | |
10/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
09/11/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
09/11/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/19/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01707
Permite Description: Indiana Dunes Model Plan La Escalera
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01707
Permit Description: Indiana Dunes Model Plan La Escalera
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2024 | COT - RSPL - Rough Soil | Passed | ||
03/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/12/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/12/2024 | COT - RSBU - Preslab | Passed | ||
04/12/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
05/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/09/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
07/22/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/27/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
08/30/2024 | COT - RSPL - Sewer | Passed | 8/30/24: Underground plumbing is connected to sewer with green tracer wire running from clean-out to sewer connection. Okay to shade pipe and backfill trench. | |
09/13/2024 | RSBU - Building Progress | Passed | Contractor has opened up walls in garage at water supply line, plumber has installed 18+ inches of copper pipes from pex line to first solder joint to meet install requirements. | |
09/17/2024 | COT - RSPL - Yard Water Line | Passed | 9/17/24: 18 inches of copper top and bottom before sweat joint outside of wall main water line | |
10/25/2024 | COT - RSEL - Electrical Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/22/2024 | COT - RSEL - Outdoor Lighting | Passed | 10/22/24 PASS | |
10/22/2024 | COT - RSME - Mechanical Final | Passed | 10/22/24 PASS | |
10/22/2024 | COT - RSPL - Plumbing Final | Passed | 10/22/24 PASS | |
10/22/2024 | RSBU - Building Final | Passed | 10/22/24 PASS | |
10/28/2024 | ENGR Engineering Final | Passed |