Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
7421 S KELLER LN
Apply Date:
12/14/2023
Applicant:
Joshua Swinney
Description:
Eisenhower Model Plan La Escalera

Permit Reviews

Permit Number - TC-MDP-1023-01703
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera
Start Date Submittal Complete Date Status  
12/15/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/26/2023 APPROVED Review Details
11/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01703
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera
Date Description Comments
12/26/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/15/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/20/2023 Post-Tension Inspection Report is required.
11/08/2024 Post-Tension Inspection Report is required.
10/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
11/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/08/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/08/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1023-01703
Permite Description: Eisenhower Model Plan La Escalera
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/29/2024 COT - BULD - SWG Clearance N/A Not Applicable Not Applicable for this subdivision. No gas appliances in these houses.
07/29/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable Not Applicable for this subdivision. No gas appliances in these houses.
10/30/2024 ENGR Engineering Final N/A Not Ready missing clean out cover in driveway. and AC Condenser

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1023-01703
Permit Description: Eisenhower Model Plan La Escalera
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/11/2024 COT - RSPL - Rough Soil Passed
04/11/2024 COT - RSPL - Yard Water Line Passed
04/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab.
04/29/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab.
04/29/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab.
04/29/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Okay to pour concrete for footings and slab.
06/03/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/03/2024 COT - RSBU - Roof Nailing Passed
07/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
08/15/2024 COT - RSBU - Interior Shear Bracing Passed
09/17/2024 COT - RSPL - Sewer Passed
09/17/2024 RSBU - Building Progress Passed 9/17/24: 18 inches of copper top and bottom before sweat joint outside of wall main water line
10/02/2024 BULD - Electrical Clearance Passed ECO Clearance issued for 7421 S Keller Ln.
10/31/2024 COT - RSEL - Electrical Final Passed 10-31-24, listed items from previous inspection have been corrected. Building final final approved.
10/31/2024 COT - RSEL - Outdoor Lighting Passed 10-31-24, listed items from previous inspection have been corrected. Building final final approved.
10/31/2024 COT - RSME - Mechanical Final Passed 10-31-24, listed items from previous inspection have been corrected. Building final final approved.
10/31/2024 COT - RSPL - Plumbing Final Passed 10-31-24, listed items from previous inspection have been corrected. Building final approved.
11/05/2024 ENGR Engineering Final Passed CO Ready
11/05/2024 RSBU - Building Final Passed 11-5-24, building final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 211 SIC-2024-11-06_V1.PDF DOCUMENTS VIEW
Z510 EISENHOWER - TRUSS CALCULATIONS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 211 PLOT PLAN_V1.PDF DOCUMENTS VIEW