Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
7439 S KELLER LN
Apply Date:
12/15/2023
Applicant:
Joshua Swinney
Description:
Eisenhower Model Plan La Escalera

Permit Reviews

Permit Number - TC-MDP-1023-01700
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera
Start Date Submittal Complete Date Status  
09/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/19/2024 APPROVED Review Details
09/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/11/2024 REQUIRES RESUBMIT Review Details
12/15/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/26/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01700
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera
Date Description Comments
12/26/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/20/2023 Post-Tension Inspection Report is required.
04/15/2024 Post-Tension Inspection Report is required.
10/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/15/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/12/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
04/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1023-01700
Permite Description: Eisenhower Model Plan La Escalera
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
07/01/2024 COT - RSBU - Interior Shear Bracing N/A Re-inspection required Not ready. Screw pattern not per schedule. 7/1/2024
08/16/2024 COT - BULD - SWG Clearance N/A Not Applicable Not Applicable for this project. There is no gas on this residence.
08/16/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable Not Applicable for this project. There is no gas on this residence.
09/27/2024 COT - RSEL - Electrical Final N/A Re-inspection required Needs smoke detectors on first floor. Handrail clearance needs to be adjusted.

9/27/2024
09/27/2024 COT - RSEL - Outdoor Lighting N/A Re-inspection required Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle.

9/27/2024
09/27/2024 COT - RSME - Mechanical Final N/A Re-inspection required Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle.

9/27/2024
09/27/2024 COT - RSPL - Plumbing Final N/A Re-inspection required Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle.

9/27/2024
09/27/2024 RSBU - Building Final N/A Re-inspection required Master bath needs shower head and faucet. Exhaust fans need covers in up stairs baths. Second bedroom has a buried receptacle.

9/27/2024

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1023-01700
Permit Description: Eisenhower Model Plan La Escalera
Total Completed Inspections - 19
Date Description Inspector Results Comments
03/28/2024 COT - RSEL - Electrical Underground Passed
03/28/2024 COT - RSPL - Rough Soil Passed
04/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/15/2024 COT - RSBU - Preslab Passed
05/03/2024 COT - RSBU - Exterior Clips/Sheathing Passed All masa clips are properly secured to bottom plate. All j-bolts have a washer and nut tighten to bottom plate. Shear wall anchors are properly installed and secured to bottom plate. Straps are secured on large headers above doors and windows. Okay to proceed with other work
05/03/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with H2.5 clips. Plywood sheathing is properly nailed to trusses per code. All rat runs and cross bracing is installed per truss calcs. Okay to proceed with top out of plumbing.
05/03/2024 COT - RSEL - Grounding/Bonding Passed Ufer ground is in place.
07/01/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved per Ralph Mellecker. 7/1/2024
07/03/2024 COT - RSBU - Interior Shear Bracing Passed 7/3/24: Shear walls are properly screwed per plan requirements. Okay to proceed with tape, texture, and paint.
08/16/2024 BULD - Electrical Clearance Passed Okay to install meter and energize panel. ECO Clearance issued for 7439 E Keller Lane to TEP.
08/16/2024 COT - RSPL - Yard Water Line Passed Main water line is connected to meter and under street pressure.
08/22/2024 COT - RSPL - Sewer Passed
09/13/2024 RSBU - Building Progress Passed Contractor has opened up walls in garage at water supply line, plumber has installed 18+ inches of copper pipes from pex line to first solder joint to meet install requirements.
09/27/2024 ENGR Engineering Final Passed CO ready
09/30/2024 COT - RSEL - Electrical Final Passed 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY.
09/30/2024 COT - RSEL - Outdoor Lighting Passed 9/30/24: Outdoor lighting is properly installed per plan and city guidelines.
09/30/2024 COT - RSME - Mechanical Final Passed 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY.
09/30/2024 COT - RSPL - Plumbing Final Passed 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY.
09/30/2024 RSBU - Building Final Passed 9/30/24: Plumbing and mechanical issues have been corrected, plans do not show receptacles in 2nd bedroom near entrance. Construction is complete per plans. Okay to issue CERTIFICATE OF OCCUPANCY.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
Z510 EISENHOWER - TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 214 PLOT PLAN_V1.PDF DOCUMENTS VIEW