Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6183 E CAMPOLINA TR
Apply Date:
10/24/2023
Applicant:
Kelly Rayman
Description:
Blackhawk H30A Model Plan

Permit Reviews

Permit Number - TC-MDP-1023-01697
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date Submittal Complete Date Status  
11/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/06/2025 APPROVED Review Details
10/25/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/31/2023 REQUIRES RESUBMIT Review Details
02/29/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 03/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01697
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 2
Date Name
09/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-1023-01697
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date Description Comments
10/25/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/18/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
10/25/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/05/2023 Post-Tension Inspection Report is required.
08/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01697
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/25/2025 COT - RSPL - Sewer Passed 9.25.25
APPROVED
09/25/2025 COT - RSPL - Rough Soil Passed 9.25.25
APPROVED
10/03/2025 COT - RSBU - Preslab Passed
10/14/2025 COT - RSPL - Yard Water Line Passed
10/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
10/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/14/2025 COT - RSBU - Roof Nailing Passed
10/23/2025 BULD - Electrical Clearance Passed 10.23.2025
Clearance TEP ECO.
10/24/2025 COT - RSEL - Electrical Underground Passed
10/24/2025 COT - RSEL - Grounding/Bonding Passed
10/24/2025 COT - RSPL - Gas Pressure Test Passed
10/27/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10.27.2025
Approved, added FHA nail plate to vent and tape to torn duct.
11/04/2025 COT - RSBU - Interior Shear Bracing Passed
12/04/2025 COT - BULD - SWG Clearance Passed 12.4.25
Approved for SWG CLEARANCE
12/09/2025 COT - RSEL - Electrical Final Passed 12.9.25
Approved
12/09/2025 COT - RSEL - Outdoor Lighting Passed 12.9.25
Approved
12/09/2025 COT - RSME - Mechanical Final Passed 12.9.25
Approved
12/09/2025 COT - RSPL - Plumbing Final Passed 12.9.25
Approved
12/09/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
12/09/2025 RSBU - Building Final Passed 12.9.25
Approved
12/09/2025 RSBU - Building Progress Passed 12.9.25
Approved

Documents

File Name Document Type  
BHK 17 SIC-2025-11-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 17 REVISED SIC-2024-02-23_V2.PDF DOCUMENTS VIEW
BHK 17 REVISED D1_V2.PDF DOCUMENTS VIEW