Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6176 E CAMPOLINA TR
Apply Date:
10/25/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30A Model Plan

Permit Reviews

Permit Number - TC-MDP-1023-01695
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date Submittal Complete Date Status  
11/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/02/2025 APPROVED Review Details
10/31/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.2 11/01/2023 REQUIRES RESUBMIT Review Details
10/25/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/31/2023 REQUIRES RESUBMIT Review Details
03/12/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.3 03/22/2024 APPROVED Review Details
08/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/02/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01695
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date Description Comments
10/25/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/22/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/22/2024 Post-Tension Inspection Report is required.
09/05/2023 Post-Tension Inspection Report is required.
08/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/22/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/22/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01695
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/26/2025 COT - RSPL - Yard Water Line Passed
09/26/2025 COT - RSPL - Sewer Passed
09/26/2025 COT - RSPL - Rough Soil Passed
10/03/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
10/03/2025 COT - RSBU - Preslab Passed
10/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/16/2025 COT - RSBU - Roof Nailing Passed 10.16.25
Passed
10/23/2025 BULD - Electrical Clearance Passed 10.23.2025
Clearance to TEP ECO.
10/24/2025 COT - RSPL - Gas Pressure Test Passed
10/24/2025 COT - RSEL - Electrical Underground Passed
10/24/2025 COT - RSEL - Grounding/Bonding Passed
10/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/06/2025 COT - RSBU - Interior Shear Bracing Passed
12/15/2025 COT - BULD - SWG Clearance Passed 12/15/25: SWG CLEARANCE APPROVED
12/18/2025 COT - RSEL - Electrical Final Passed
12/18/2025 COT - RSEL - Outdoor Lighting Passed
12/18/2025 COT - RSME - Mechanical Final Passed
12/18/2025 COT - RSPL - Plumbing Final Passed
12/18/2025 ENGR Engineering Final Passed Exterior work is complete in accordance with approved plans.
12/18/2025 RSBU - Building Final Passed 12/18/2025
Verified secured oven in kitchen.
12/18/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
BHK 93 FINAL SIC-2025-11-13_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 93 NARRATIVE LETTER_V1.PDF DOCUMENTS VIEW
BHK 93 REV1 SIC_V1.PDF DOCUMENTS VIEW
BHK AVP_V1.PDF DOCUMENTS VIEW