Permit: TC-MDP-1023-01690
Permit Details
Apply Date:
10/23/2023
Applicant:
Kelly Rayman
Description:
Blackhawk H30K Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01690
Permit Status: Issued
Permit Description: Blackhawk H30K Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 03/18/2024 | APPROVED |
10/24/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/31/2023 | REQUIRES RESUBMIT |
10/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 11/01/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01690
Permit Status: Issued
Permit Description: Blackhawk H30K Model Plan
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
10/03/2023 | Post-Tension Inspection Report is required. |
10/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
10/24/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
10/24/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1023-01690
Permit Status: Issued
Permit Description: Blackhawk H30K Model Plan
Date | Description | Comments |
---|---|---|
08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |