Permit: TC-MDP-1023-01686
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
6151 E CAMPOLINA TR
Address NEW:
6151 E CAMPOLINA TR
Apply Date:
10/23/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01686
Permit Status: Inspections
Permit Description: Blackhawk H30D Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2025 | APPROVED |
| 10/24/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/31/2023 | REQUIRES RESUBMIT |
| 03/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 03/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01686
Permit Status: Inspections
Permit Description: Blackhawk H30D Model Plan
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/22/2024 | Post-Tension Inspection Report is required. |
| 03/22/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 10/03/2023 | Post-Tension Inspection Report is required. |
| 10/24/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1023-01686
Permit Status: Inspections
Permit Description: Blackhawk H30D Model Plan
| Date | Description | Comments |
|---|---|---|
| 08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/22/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 10/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1023-01686
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2026 | COT - RSPL - Rough Soil | Passed | 2.6.26 Approved |
|
| 02/06/2026 | COT - RSPL - Sewer | Passed | ||
| 02/06/2026 | COT - RSPL - Yard Water Line | Passed | 2.6.26 Approved |
|
| 02/12/2026 | BULD - Electrical Clearance | Passed | 02/12/2026 Clearance TEP ECO. |
|
| 02/12/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 02/12/2026 Approved per site plan and setbacks, foundation details. Cleaned debris from footing. Okay for concrete placement. |
|
| 02/12/2026 | COT - RSBU - Preslab | Passed | 02/12/2026 Approved per site plan and setbacks, foundation details. Cleaned debris from footing. Okay for concrete placement. |
|
| 02/12/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 02/12/2026 | COT - RSEL - Grounding/Bonding | Passed | 02/12/2026 Tied into MSP with ground rods. |
|
| 02/24/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 02/24/2026 Corrections made to prior inspection. |
|
| 02/24/2026 | COT - RSBU - Roof Nailing | Passed | 02/24/2026 Corrections made to prior inspection. |