Permit: TC-MDP-1023-01685
Permit Details
Apply Date:
10/23/2023
Applicant:
Kelly Rayman
Description:
Blackhawk H30D Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01685
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 03/22/2024 | APPROVED |
10/24/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/31/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01685
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
03/22/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
03/22/2024 | Post-Tension Inspection Report is required. |
03/22/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
03/22/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
10/03/2023 | Post-Tension Inspection Report is required. |
10/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
10/24/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1023-01685
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan
Date | Description | Comments |
---|---|---|
10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |