Permit: TC-MDP-1023-01683
Permit Details
Apply Date:
10/19/2023
Applicant:
Kelly Rayman
Description:
Blackhawk H30M Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01683
Permit Status: Issued
Permit Description: Blackhawk H30M Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/04/2024 | APPROVED |
10/23/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/27/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01683
Permit Status: Issued
Permit Description: Blackhawk H30M Model Plan
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
10/03/2023 | Post-Tension Inspection Report is required. |
10/04/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
10/23/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
10/23/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1023-01683
Permit Status: Issued
Permit Description: Blackhawk H30M Model Plan
Date | Description | Comments |
---|---|---|
10/27/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
10/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |