Permit: TC-MDP-1023-01680
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6191 E CAMPOLINA TR
Address NEW:
6191 E CAMPOLINA TR
Apply Date:
10/19/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01680
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/23/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/27/2023 | APPROVED |
| 10/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/30/2025 | APPROVED |
| 02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/04/2024 | APPROVED |
| 08/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01680
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/29/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-1023-01680
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Date | Description | Comments |
|---|---|---|
| 10/23/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/27/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 10/23/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/29/2025 | Post-Tension Inspection Report is required. | |
| 10/03/2023 | Post-Tension Inspection Report is required. | |
| 10/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/04/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01680
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2025 | COT - RSPL - Rough Soil | Passed | 9.18.2025 Okay to backfill, shading required. |
|
| 09/18/2025 | COT - RSPL - Sewer | Passed | ||
| 09/18/2025 | COT - RSPL - Yard Water Line | Passed | 9.18.2025 Okay to backfill, shading required. |
|
| 09/25/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9.25.25 APPROVED |
|
| 09/25/2025 | COT - RSBU - Preslab | Passed | 9.25.25 APPROVED |
|
| 09/25/2025 | COT - RSEL - Electrical Underground | Passed | 9.25.25 APPROVED |
|
| 09/25/2025 | COT - RSEL - Grounding/Bonding | Passed | 9.25.25 APPROVED |
|
| 10/16/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10.16.25 Corrections made |
|
| 10/16/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/16/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.16.25 Passed |
|
| 10/16/2025 | COT - RSPL - Gas Pressure Test | Passed | 10.16.25 Passed |
|
| 10/23/2025 | BULD - Electrical Clearance | Passed | 10.23.2025 Clearance to TEP ECO. |
|
| 10/23/2025 | COT - RSBU - Interior Shear Bracing | Passed | 10.23.2025 Added 7:7 nails on rear shear wall. |
|
| 12/03/2025 | COT - BULD - SWG Clearance | Passed | 12.3.25 Approved |
|
| 12/10/2025 | COT - RSEL - Electrical Final | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | COT - RSEL - Outdoor Lighting | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | COT - RSME - Mechanical Final | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | COT - RSPL - Plumbing Final | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 12/10/2025 | RSBU - Building Final | Passed | 12.10.25 APPROVED |
|
| 12/10/2025 | RSBU - Building Progress | Passed | 12.10.25 APPROVED |