Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6191 E CAMPOLINA TR
Apply Date:
10/19/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan

Permit Reviews

Permit Number - TC-MDP-1023-01680
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Start Date Submittal Complete Date Status  
10/23/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/27/2023 APPROVED Review Details
10/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/30/2025 APPROVED Review Details
02/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/04/2024 APPROVED Review Details
08/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/29/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01680
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Total Outstanding Activity Conditions - 2
Date Name
08/29/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/07/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1023-01680
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Date Description Comments
10/23/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/27/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/23/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/29/2025 Post-Tension Inspection Report is required.
10/03/2023 Post-Tension Inspection Report is required.
10/04/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/04/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01680
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/18/2025 COT - RSPL - Rough Soil Passed 9.18.2025
Okay to backfill, shading required.
09/18/2025 COT - RSPL - Sewer Passed
09/18/2025 COT - RSPL - Yard Water Line Passed 9.18.2025
Okay to backfill, shading required.
09/25/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 9.25.25
APPROVED
09/25/2025 COT - RSBU - Preslab Passed 9.25.25
APPROVED
09/25/2025 COT - RSEL - Electrical Underground Passed 9.25.25
APPROVED
09/25/2025 COT - RSEL - Grounding/Bonding Passed 9.25.25
APPROVED
10/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10.16.25
Corrections made
10/16/2025 COT - RSBU - Roof Nailing Passed
10/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10.16.25
Passed
10/16/2025 COT - RSPL - Gas Pressure Test Passed 10.16.25
Passed
10/23/2025 BULD - Electrical Clearance Passed 10.23.2025
Clearance to TEP ECO.
10/23/2025 COT - RSBU - Interior Shear Bracing Passed 10.23.2025
Added 7:7 nails on rear shear wall.
12/03/2025 COT - BULD - SWG Clearance Passed 12.3.25
Approved
12/10/2025 COT - RSEL - Electrical Final Passed 12.10.25
APPROVED
12/10/2025 COT - RSEL - Outdoor Lighting Passed 12.10.25
APPROVED
12/10/2025 COT - RSME - Mechanical Final Passed 12.10.25
APPROVED
12/10/2025 COT - RSPL - Plumbing Final Passed 12.10.25
APPROVED
12/10/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
12/10/2025 RSBU - Building Final Passed 12.10.25
APPROVED
12/10/2025 RSBU - Building Progress Passed 12.10.25
APPROVED

Documents

File Name Document Type  
BHK 15 SIC-2025-10-28_V1.PDF DOCUMENTS VIEW
BHK 15 REV1 NARRATIVE_V1.PDF DOCUMENTS VIEW
BHK 15 REV1 SIC-2024-02-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 15 D1_V1.PDF DOCUMENTS VIEW
BHK 15 SIC-2023-10-20_V1.PDF DOCUMENTS VIEW