Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6199 E CAMPOLINA TR
Apply Date:
10/19/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)

Permit Reviews

Permit Number - TC-MDP-1023-01677
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Start Date Submittal Complete Date Status  
10/23/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/27/2023 APPROVED Review Details
03/01/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/11/2024 APPROVED Review Details
08/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/29/2025 APPROVED Review Details
10/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/30/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01677
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Date Description Comments
10/23/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/27/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/23/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/29/2025 Post-Tension Inspection Report is required.
10/03/2023 Post-Tension Inspection Report is required.
10/04/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/04/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/07/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01677
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/15/2025 COT - RSPL - Rough Soil Passed 9.15.25
APPROVED
09/15/2025 COT - RSPL - Sewer Passed 9.15.25
APPROVED
09/19/2025 COT - RSPL - Yard Water Line Passed
09/19/2025 BULD - Electrical Clearance Passed 9.19.2025
Clearance for TEP ECO.
09/19/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 9.19.2025
Verified per plan, okay for concrete placement.
09/19/2025 COT - RSBU - Preslab Passed 9.19.2025
Verified per plan, okay for concrete placement.
09/19/2025 COT - RSEL - Electrical Underground Passed
09/19/2025 COT - RSEL - Grounding/Bonding Passed
10/06/2025 COT - RSBU - Roof Nailing Passed
10/09/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10.9.25
Passed
10/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10.20.2025
Seal penetration at garage and taped ripped ducts at marked area second floor, add mud ring for Ufer, fixed same day.
10/20/2025 COT - RSPL - Gas Pressure Test Passed 10.20.2025
Approved, holding 15psi.
10/29/2025 COT - RSBU - Interior Shear Bracing Passed 10.29.2025
Added brass drywall screws to shower area.
12/01/2025 COT - BULD - SWG Clearance Passed 12-1-25: okay to install gas meter-clearance issued to SWG.
12/04/2025 COT - RSEL - Electrical Final Passed
12/04/2025 COT - RSEL - Outdoor Lighting Passed
12/04/2025 COT - RSME - Mechanical Final Passed
12/04/2025 COT - RSPL - Plumbing Final Passed
12/04/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
12/04/2025 RSBU - Building Final Passed 12.4.25
Approved
12/04/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
BHK 13 SIC-2025-10-28_V1.PDF DOCUMENTS VIEW
BHK 13 REV1 D1_V1.PDF DOCUMENTS VIEW
BHK 13 REV1 NARRATIVE_V1.PDF DOCUMENTS VIEW
BHK 13 REV1 SIC-2024-02-29_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 13 D1_V1.PDF DOCUMENTS VIEW
BHK 13 SIC-2023-10-20_V1.PDF DOCUMENTS VIEW