Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Withdrawn
Type:
Model Building Permit
Apply Date:
10/20/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan

Permit Reviews

Permit Number - TC-MDP-1023-01675
Permit Status: Withdrawn
Permit Description: Blackhawk H30K Model Plan
Start Date Submittal Complete Date Status  
10/23/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/27/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01675
Permit Status: Withdrawn
Permit Description: Blackhawk H30K Model Plan
Total Outstanding Activity Conditions - 5
Date Name
09/07/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/03/2023 Post-Tension Inspection Report is required.
10/04/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/23/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/23/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Conditions

Permit Number - TC-MDP-1023-01675
Permit Status: Withdrawn
Permit Description: Blackhawk H30K Model Plan
Date Description Comments
10/27/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/04/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 98 D1_V1.PDF DOCUMENTS VIEW
BHK 98 SIC-2023-10-20_V1.PDF DOCUMENTS VIEW