Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
10/20/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30A Model Plan

Permit Reviews

Permit Number - TC-MDP-1023-01674
Permit Status: Issued
Permit Description: Blackhawk H30A Model Plan
Start Date Submittal Complete Date Status  
02/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/11/2024 APPROVED Review Details
10/23/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/27/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01674
Permit Status: Issued
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 5
Date Name
03/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/08/2024 Post-Installed Anchor Inspection Report is required.
03/08/2024 Post-Tension Inspection Report is required.
03/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/08/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-1023-01674
Permit Status: Issued
Permit Description: Blackhawk H30A Model Plan
Date Description Comments
10/23/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/27/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/23/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/05/2023 Post-Tension Inspection Report is required.
10/04/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/04/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Documents

File Name Document Type  
BHK 97 REV1 D1_V1.PDF DOCUMENTS VIEW
BHK 97 REV1 NARRATIVE_V1.PDF DOCUMENTS VIEW
BHK 97 REV1 SIC-2024-02-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 97 D1_V1.PDF DOCUMENTS VIEW
BHK 97 SIC-2023-10-20_V1.PDF DOCUMENTS VIEW