Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Address NEW:
9852 E GRAY HAWK DR
Apply Date:
10/20/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan

Permit Reviews

Permit Number - TC-MDP-1023-01669
Permit Status: Issued
Permit Description: Casas del Cerrito H35G Model Plan
Start Date Submittal Complete Date Status  
10/20/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/30/2023 REQUIRES RESUBMIT Review Details
02/06/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 02/13/2024 APPROVED Review Details
09/19/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/03/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01669
Permit Status: Issued
Permit Description: Casas del Cerrito H35G Model Plan
Date Description Comments
02/13/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/11/2023 Post-Tension Inspection Report is required.
10/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/20/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-1023-01669
Permite Description: Casas del Cerrito H35G Model Plan
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/19/2024 COT - RSEL - Electrical Final N/A Canceled

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1023-01669
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/15/2024 COT - RSPL - Yard Water Line Passed
02/15/2024 COT - RSPL - Rough Soil Passed
02/15/2024 COT - RSPL - Sewer Passed
02/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/20/2024 COT - RSBU - Preslab Passed
02/20/2024 COT - RSEL - Electrical Underground Passed
02/20/2024 COT - RSEL - Grounding/Bonding Passed
02/20/2024 BULD - Electrical Clearance Passed TEP ECO
02/26/2024 COT - RSBU - Roof Nailing Passed
02/27/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/29/2024 RSBU - Building Progress Passed
03/04/2024 COT - RSBU - Interior Shear Bracing Passed 3/4/24: Drywall on interior shear walls is properly installed and secured with screws per plan details. Okay to tape, texture, and paint all walls and ceilings.
03/05/2024 COT - RSPL - Gas Pressure Test Passed
03/15/2024 COT - BULD - SWG Clearance Passed Gas valves are installed in kitchen for stove and laundry room for dryer. Okay to install meter and energize system.
03/19/2024 COT - RSEL - Outdoor Lighting Passed
03/20/2024 COT - RSEL - Electrical Final Passed
03/20/2024 COT - RSME - Mechanical Final Passed
03/20/2024 COT - RSPL - Plumbing Final Passed
03/20/2024 RSBU - Building Final Passed
03/21/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
CDC 24 SIC-2025-09-18_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 24 D1_V1.PDF DOCUMENTS VIEW
CDC 24 SIC-2023-10-20_V1.PDF DOCUMENTS VIEW
CDC AVP RELEASE_V1.PDF DOCUMENTS VIEW