Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9726 E GRAY HAWK DR
Apply Date:
10/20/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35E Model Plan

Permit Reviews

Permit Number - TC-MDP-1023-01668
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35E Model Plan
Start Date Submittal Complete Date Status  
10/20/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/30/2023 REQUIRES RESUBMIT Review Details
06/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/18/2024 APPROVED Review Details
02/06/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.2 02/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01668
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35E Model Plan
Total Outstanding Activity Conditions - 2
Date Name
06/18/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-1023-01668
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35E Model Plan
Date Description Comments
04/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/05/2023 Post-Tension Inspection Report is required.
08/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01668
Permite Description: Casas del Cerrito H35E Model Plan
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/27/2024 COT - RSEL - Grounding/Bonding N/A Not Applicable
07/05/2024 ENGR Engineering Final N/A Not Ready Complete the removal of all pink salmon from the railyard and complete the minor grading of the drainage patterns from the backyard to the front on both the east and west sides of this property prior to rescheduling this inspection next week

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01668
Permit Description: Casas del Cerrito H35E Model Plan
Total Completed Inspections - 20
Date Description Inspector Results Comments
02/23/2024 COT - RSPL - Sewer Passed
02/23/2024 COT - RSPL - Yard Water Line Passed
03/19/2024 COT - RSPL - Rough Soil Passed
03/27/2024 BULD - Electrical Clearance Passed
03/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/27/2024 COT - RSBU - Preslab Passed
03/27/2024 COT - RSEL - Electrical Underground Passed
04/17/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/17/2024 COT - RSBU - Roof Nailing Passed
04/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/30/2024 COT - RSPL - Gas Pressure Test Passed
04/30/2024 RSBU - Building Progress Passed
05/15/2024 COT - RSBU - Interior Shear Bracing Passed
06/17/2024 COT - BULD - SWG Clearance Passed Sweep and conduit are properly secured to electrical panel and ran out to TEP's transformer. Okay to shade conduit and backfill trench.
06/21/2024 COT - RSEL - Electrical Final Passed
06/21/2024 COT - RSEL - Outdoor Lighting Passed
06/21/2024 COT - RSPL - Plumbing Final Passed
06/21/2024 COT - RSME - Mechanical Final Passed
06/21/2024 RSBU - Building Final Passed
07/10/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
CDC 45 SIC-2024-06-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 45 D1_V1.PDF DOCUMENTS VIEW
CDC 45 SIC-2023-10-20_V1.PDF DOCUMENTS VIEW
CDC AVP RELEASE_V1.PDF DOCUMENTS VIEW