Permit Number - TC-MDP-1023-01665
Permit Status: Complete
Permit Description: SCC Plan 1368
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.6 | 04/12/2024 | REQUIRES RESUBMIT |
| 11/17/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 01/02/2024 | REQUIRES RESUBMIT |
| 07/10/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.9 | 07/23/2024 | REQUIRES RESUBMIT |
| 08/12/2024 | RESTAMP - RESIDENTIAL v.1 | 08/20/2024 | APPROVED |
| 01/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 01/05/2024 | REQUIRES RESUBMIT |
| 05/03/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.8 | 05/14/2024 | REQUIRES RESUBMIT |
| 02/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/26/2025 | APPROVED |
| 01/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.4 | 01/17/2024 | REQUIRES RESUBMIT |
| 04/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.7 | 05/01/2024 | REQUIRES RESUBMIT |
| 09/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/24/2024 | APPROVED |
| 08/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.10 | 08/12/2024 | APPROVED |
| 02/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.5 | 04/05/2024 | REQUIRES RESUBMIT |
| 11/07/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/16/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1023-01665
Permit Status: Complete
Permit Description: SCC Plan 1368
| Date | Description | Comments |
|---|---|---|
| 04/18/2024 | Provide elevation measurements for Next Upstream Manhole and Finished Floor Elevation. Provide Backwater valve protection as/if required. | |
| 08/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/11/2023 | Please submit Sewer Receipt. Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/07/2023 | Please submit Sewer Receipt. Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 10/11/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01665
Permite Description: SCC Plan 1368
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2024 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 9/9/24: properly test system by releasing air. Properly support all piping throughout, shading required throughout. Fittings must be listed and approved for such use. |
| 09/09/2024 | COT - RSPL - Backwater Valve | N/A | Re-inspection required | 9/9/24: properly test system by releasing air. Properly support all piping throughout, shading required throughout. Fittings must be listed and approved for such use. |
| 09/23/2024 | COT - RSBU - Interior Shear Bracing | N/A | Partial Pass | Interior framing in place but opposite of approved plans. Contractor to,make corrections with COT. |
| 01/22/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | Site does not use gas |
| 01/22/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable | no underground electric |
| 01/22/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Site does not use gas |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01665
Permit Description: SCC Plan 1368
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2024 | COT - RSPL - Rough Soil | Passed | 9/9/24: properly test system by releasing air. Properly support all piping throughout, shading required throughout. Fittings must be listed and approved for such use. 9/10/24: corrections made ok to proceed. Shading required |
|
| 09/10/2024 | COT - RSPL - Backwater Valve | Passed | 9/9/24: properly test system by releasing air. Properly support all piping throughout, shading required throughout. Fittings must be listed and approved for such use. 9/10/24: corrections made ok to proceed. Shading required |
|
| 09/12/2024 | COT - RSBU - Preslab and floodplain | Passed | Slab inspection complete: ensure slab area is properly termite treated. No floodplain inspection at this time. | |
| 09/12/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | OK to place concrete in progress areas. | |
| 09/12/2024 | COT - RSEL - Grounding/Bonding | Passed | Rebar ufer in place. | |
| 09/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/23/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | OK to cover exterior walls. | |
| 09/23/2024 | COT - RSBU - Roof Nailing | Passed | OK to dry-in room system. | |
| 10/18/2024 | BULD - Electrical Clearance | Passed | units 1 & 2 | |
| 10/22/2024 | COT - RSBU - Interior Shear Bracing | Passed | OK to insulate and cover walls. | |
| 10/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | OK to insulate and cover walls. | |
| 01/22/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 1/22/25 | |
| 01/22/2025 | COT - RSPL - Sewer | Passed | Passed 1/22/25 ok to backfill | |
| 01/22/2025 | RSBU - Building Progress | Passed | Passed 1/22/25 | |
| 02/18/2025 | COT - RSEL - Electrical Final | Passed | ||
| 02/18/2025 | COT - RSME - Mechanical Final | Passed | ||
| 02/18/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 02/18/2025 | ENGR Engineering Final | Passed | ||
| 02/18/2025 | RSBU - Building Final | Passed |